SAP ABAP Message Class 5Z Message Number 280 (End date of action was changed in infotype)
Hierarchy
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
   PY-DE-PS (Application Component) Public Sector
     P01O (Package) HR Germany: Public Sector
Attribute
Message class 5Z  
Short Description IS-HR/PSG Public Sector Payroll - Germany    
Message Number 280  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20000330   
Message Text
End date of action was changed in infotype
Help Document

Diagnosis

The result record stored has a planned program duration

of to .

The current master data record has a program duration

of to .

Unless additional factors apply, change notifications are not created. This may be due to the fact that the program was ended prematurely, for example.

Procedure

Carry out an accuracy check. Has an incorrect entry been made or was the program ended prematurely? If necessary, the program sponsor should be notified informally.

History
Last changed on/by 20130531  SAP 
SAP Release Created in