SAP ABAP Message Class /MAP/AD01 Message Number 081 (Change in row &1 cannot be made (see longtext))
Hierarchy
☛
BI_CONT (Software Component) Business Intelligence Content
⤷ BW-BCT-PLA-RAP (Application Component) Retail Assortment Planning
⤷ /MAP/P04 (Package) BW: Assortment Assignment Content
⤷ BW-BCT-PLA-RAP (Application Component) Retail Assortment Planning
⤷ /MAP/P04 (Package) BW: Assortment Assignment Content
Attribute
Message class | /MAP/AD01 | ||
Short Description | Assortment Definition Messages | ||
Message Number | 081 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20141101 |
Message Text
Change in row &1 cannot be made (see longtext)
Help Document
Diagnosis
You have planned a successor for a released assignment in row . In addition, you have already planned another successor for this successor. The assignments cannot overlap but there must also be no gaps between them. The change you plan to make to the direct successor to a released assignment would cause exactly this however.
System Response
The action cannot be carried out as it would lead to an inconsistency in row with the planned successor in row .
Procedure
You can delete the successor assignment in row and then the planned successor assignment in row . Alternatively, you can save first, which will give the current assignment the new status (planned for scheduling). The next time you enter the transaction, you can then manipulate the successor assignments.
Procedure for System Administration
History
Last changed on/by | 20141101 | SAP | |
SAP Release Created in | 351 |