SAP ABAP Message Class /MAP/AD01 Message Number 064 (Assignment in row &1 cannot be scheduled (see longtext))
Hierarchy
☛
BI_CONT (Software Component) Business Intelligence Content
⤷ BW-BCT-PLA-RAP (Application Component) Retail Assortment Planning
⤷ /MAP/P04 (Package) BW: Assortment Assignment Content
⤷ BW-BCT-PLA-RAP (Application Component) Retail Assortment Planning
⤷ /MAP/P04 (Package) BW: Assortment Assignment Content
Attribute
Message class | /MAP/AD01 | ||
Short Description | Assortment Definition Messages | ||
Message Number | 064 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20141101 |
Message Text
Assignment in row &1 cannot be scheduled (see longtext)
Help Document
Diagnosis
You want to schedule the assignment in line &V1& without defining a successor. However, this is only possible for assignments that have already been released.
System Response
The action is not performed.
Procedure
When released assignments are scheduled, the end of the validity period is set and the release status is set to enable this assignment to be reexported to operational systems. This step is not needed for planned assignments, as the assignments are not yet known in operational systems. In this case, the planned assignment should either be deleted, or the end date set manually.
Procedure for System Administration
History
Last changed on/by | 20141101 | SAP | |
SAP Release Created in | 351 |