SAP ABAP Message Class /MAP/AD01 Message Number 064 (Assignment in row &1 cannot be scheduled (see longtext))
Hierarchy
BI_CONT (Software Component) Business Intelligence Content
   BW-BCT-PLA-RAP (Application Component) Retail Assortment Planning
     /MAP/P04 (Package) BW: Assortment Assignment Content
Attribute
Message class /MAP/AD01  
Short Description Assortment Definition Messages    
Message Number 064  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141101   
Message Text
Assignment in row &1 cannot be scheduled (see longtext)
Help Document

Diagnosis

You want to schedule the assignment in line &V1& without defining a successor. However, this is only possible for assignments that have already been released.

System Response

The action is not performed.

Procedure

When released assignments are scheduled, the end of the validity period is set and the release status is set to enable this assignment to be reexported to operational systems. This step is not needed for planned assignments, as the assignments are not yet known in operational systems. In this case, the planned assignment should either be deleted, or the end date set manually.

Procedure for System Administration

History
Last changed on/by 20141101  SAP 
SAP Release Created in   351