Table/Structure Field list used by SAP ABAP View BIW_NWA_D (Data Collection: Network Activity Dates for BW)
SAP ABAP View BIW_NWA_D (Data Collection: Network Activity Dates for BW) is using
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  AFKO - AUFNR Order Number
2 Table/Structure Field  AFKO - AUFNR Order Number
3 Table/Structure Field  AFKO - DISPO MRP controller for the order
4 Table/Structure Field  AFKO - DISPO MRP controller for the order
5 Table/Structure Field  AFKO - MANDT Client
6 Table/Structure Field  AFKO - MANDT Client
7 Table/Structure Field  AFKO - PRONR Project definition
8 Table/Structure Field  AFKO - PRONR Project definition
9 Table/Structure Field  AFVC - ANFKO Requesting cost center
10 Table/Structure Field  AFVC - ANFKO Requesting cost center
11 Table/Structure Field  AFVC - ANFKOKRS Controlling area of the requesting cost center
12 Table/Structure Field  AFVC - ANFKOKRS Controlling area of the requesting cost center
13 Table/Structure Field  AFVC - APLZL General counter for order
14 Table/Structure Field  AFVC - APLZL General counter for order
15 Table/Structure Field  AFVC - ARBID Object ID of the resource
16 Table/Structure Field  AFVC - ARBID Object ID of the resource
17 Table/Structure Field  AFVC - AUFPL Routing number of operations in the order
18 Table/Structure Field  AFVC - AUFPL Routing number of operations in the order
19 Table/Structure Field  AFVC - BUKRS Company Code
20 Table/Structure Field  AFVC - BUKRS Company Code
21 Table/Structure Field  AFVC - EBELN Purchasing Document Number
22 Table/Structure Field  AFVC - EBELN Purchasing Document Number
23 Table/Structure Field  AFVC - EBELP Item Number of Purchasing Document
24 Table/Structure Field  AFVC - EBELP Item Number of Purchasing Document
25 Table/Structure Field  AFVC - EKGRP Purchasing group for external processing
26 Table/Structure Field  AFVC - EKGRP Purchasing group for external processing
27 Table/Structure Field  AFVC - EKORG Purchasing organization
28 Table/Structure Field  AFVC - EKORG Purchasing organization
29 Table/Structure Field  AFVC - GSBER Business Area
30 Table/Structure Field  AFVC - GSBER Business Area
31 Table/Structure Field  AFVC - INFNR Number of purchasing info record
32 Table/Structure Field  AFVC - INFNR Number of purchasing info record
33 Table/Structure Field  AFVC - LARNT Activity Type
34 Table/Structure Field  AFVC - LARNT Activity Type
35 Table/Structure Field  AFVC - LIFNR Account Number of Vendor or Creditor
36 Table/Structure Field  AFVC - LIFNR Account Number of Vendor or Creditor
37 Table/Structure Field  AFVC - LTXA1 Operation short text
38 Table/Structure Field  AFVC - LTXA1 Operation short text
39 Table/Structure Field  AFVC - MATKL Material Group
40 Table/Structure Field  AFVC - MATKL Material Group
41 Table/Structure Field  AFVC - NPRIO Priority
42 Table/Structure Field  AFVC - NPRIO Priority
43 Table/Structure Field  AFVC - OBJNR Object number
44 Table/Structure Field  AFVC - OBJNR Object number
45 Table/Structure Field  AFVC - PRCTR Profit Center
46 Table/Structure Field  AFVC - PRCTR Profit Center
47 Table/Structure Field  AFVC - PROJN Work breakdown structure element (WBS element)
48 Table/Structure Field  AFVC - PROJN Work breakdown structure element (WBS element)
49 Table/Structure Field  AFVC - SAKTO Cost Element
50 Table/Structure Field  AFVC - SAKTO Cost Element
51 Table/Structure Field  AFVC - SCOPE Object Class
52 Table/Structure Field  AFVC - SCOPE Object Class
53 Table/Structure Field  AFVC - STEUS Control key
54 Table/Structure Field  AFVC - STEUS Control key
55 Table/Structure Field  AFVC - SUMNR Node number of the superior operation
56 Table/Structure Field  AFVC - SUMNR Node number of the superior operation
57 Table/Structure Field  AFVC - VORNR Operation/Activity Number
58 Table/Structure Field  AFVC - VORNR Operation/Activity Number
59 Table/Structure Field  AFVC - WAERS Currency Key
60 Table/Structure Field  AFVC - WAERS Currency Key
61 Table/Structure Field  AFVC - WERKS Plant
62 Table/Structure Field  AFVC - WERKS Plant
63 Table/Structure Field  AFVV - ABRUE Teardown
64 Table/Structure Field  AFVV - ABRUE Teardown
65 Table/Structure Field  AFVV - ARBEH Unit for work
66 Table/Structure Field  AFVV - ARBEH Unit for work
67 Table/Structure Field  AFVV - ARBEI Work involved in the activity
68 Table/Structure Field  AFVV - ARBEI Work involved in the activity
69 Table/Structure Field  AFVV - ARUZE Unit of measure for teardown
70 Table/Structure Field  AFVV - ARUZE Unit of measure for teardown
71 Table/Structure Field  AFVV - BEARP Processing time (forecast)
72 Table/Structure Field  AFVV - BEARP Processing time (forecast)
73 Table/Structure Field  AFVV - BEARZ Processing time
74 Table/Structure Field  AFVV - BEARZ Processing time
75 Table/Structure Field  AFVV - BEAZE Unit of measure for processing time
76 Table/Structure Field  AFVV - BEAZE Unit of measure for processing time
77 Table/Structure Field  AFVV - BEAZP Unit of processing time (Forecast)
78 Table/Structure Field  AFVV - BEAZP Unit of processing time (Forecast)
79 Table/Structure Field  AFVV - DAUME Unit for the minimum duration
80 Table/Structure Field  AFVV - DAUME Unit for the minimum duration
81 Table/Structure Field  AFVV - DAUMI Minimum activity duration
82 Table/Structure Field  AFVV - DAUMI Minimum activity duration
83 Table/Structure Field  AFVV - DAUNE Normal duration/unit
84 Table/Structure Field  AFVV - DAUNE Normal duration/unit
85 Table/Structure Field  AFVV - DAUNO Normal duration of the activity
86 Table/Structure Field  AFVV - DAUNO Normal duration of the activity
87 Table/Structure Field  AFVV - EINSA Constraint on the basic start date for the activity
88 Table/Structure Field  AFVV - EINSA Constraint on the basic start date for the activity
89 Table/Structure Field  AFVV - EINSE Constraint on the finish date of the activity
90 Table/Structure Field  AFVV - EINSE Constraint on the finish date of the activity
91 Table/Structure Field  AFVV - EPANF Dispatched start date for operation
92 Table/Structure Field  AFVV - EPANF Dispatched start date for operation
93 Table/Structure Field  AFVV - EPANZ Dispatched start time for operation
94 Table/Structure Field  AFVV - EPANZ Dispatched start time for operation
95 Table/Structure Field  AFVV - EPEND Dispatched finish date
96 Table/Structure Field  AFVV - EPEND Dispatched finish date
97 Table/Structure Field  AFVV - EPENZ Dispatched finish time
98 Table/Structure Field  AFVV - EPENZ Dispatched finish time
99 Table/Structure Field  AFVV - EWDAM Minimum duration (from forecast) for activity
100 Table/Structure Field  AFVV - EWDAM Minimum duration (from forecast) for activity
101 Table/Structure Field  AFVV - EWDAN Normal duration (from forecast) of activity
102 Table/Structure Field  AFVV - EWDAN Normal duration (from forecast) of activity
103 Table/Structure Field  AFVV - EWDME Unit for forecast minimum duration
104 Table/Structure Field  AFVV - EWDME Unit for forecast minimum duration
105 Table/Structure Field  AFVV - EWDNE Unit for forecast normal duration
106 Table/Structure Field  AFVV - EWDNE Unit for forecast normal duration
107 Table/Structure Field  AFVV - EWEND Forecast finish date
108 Table/Structure Field  AFVV - EWEND Forecast finish date
109 Table/Structure Field  AFVV - EWENZ Forecast finish time for the activity
110 Table/Structure Field  AFVV - EWENZ Forecast finish time for the activity
111 Table/Structure Field  AFVV - EWSTA Forecast date constraint on activity start
112 Table/Structure Field  AFVV - EWSTA Forecast date constraint on activity start
113 Table/Structure Field  AFVV - EWSTD Forecasted start date for the activity
114 Table/Structure Field  AFVV - EWSTD Forecasted start date for the activity
115 Table/Structure Field  AFVV - EWSTE Forecast date constraint on activity finish
116 Table/Structure Field  AFVV - EWSTE Forecast date constraint on activity finish
117 Table/Structure Field  AFVV - EWSTZ Forecast start time of the activity
118 Table/Structure Field  AFVV - EWSTZ Forecast start time of the activity
119 Table/Structure Field  AFVV - FPAVD Earliest scheduled start date (forecast)
120 Table/Structure Field  AFVV - FPAVD Earliest scheduled start date (forecast)
121 Table/Structure Field  AFVV - FPAVZ Earliest scheduled start time (forecast)
122 Table/Structure Field  AFVV - FPAVZ Earliest scheduled start time (forecast)
123 Table/Structure Field  AFVV - FPEDD Earliest scheduled finish date (forecast)
124 Table/Structure Field  AFVV - FPEDD Earliest scheduled finish date (forecast)
125 Table/Structure Field  AFVV - FPEDZ Earliest scheduled finish time (forecast)
126 Table/Structure Field  AFVV - FPEDZ Earliest scheduled finish time (forecast)
127 Table/Structure Field  AFVV - FSAVD Earliest scheduled start: Execution (date)
128 Table/Structure Field  AFVV - FSAVD Earliest scheduled start: Execution (date)
129 Table/Structure Field  AFVV - FSAVZ Earliest scheduled start: Execution (time)
130 Table/Structure Field  AFVV - FSAVZ Earliest scheduled start: Execution (time)
131 Table/Structure Field  AFVV - FSEDD Earliest scheduled finish: Execution (date)
132 Table/Structure Field  AFVV - FSEDD Earliest scheduled finish: Execution (date)
133 Table/Structure Field  AFVV - FSEDZ Earliest scheduled finish: Execution (time)
134 Table/Structure Field  AFVV - FSEDZ Earliest scheduled finish: Execution (time)
135 Table/Structure Field  AFVV - FSELD Earliest scheduled finish: Wait (date)
136 Table/Structure Field  AFVV - FSELD Earliest scheduled finish: Wait (date)
137 Table/Structure Field  AFVV - FSELZ Earliest scheduled finish: Wait (time)
138 Table/Structure Field  AFVV - FSELZ Earliest scheduled finish: Wait (time)
139 Table/Structure Field  AFVV - FSSAD Earliest scheduled start: Teardown (date)
140 Table/Structure Field  AFVV - FSSAD Earliest scheduled start: Teardown (date)
141 Table/Structure Field  AFVV - FSSAZ Earliest scheduled start: Teardown (time)
142 Table/Structure Field  AFVV - FSSAZ Earliest scheduled start: Teardown (time)
143 Table/Structure Field  AFVV - FSSBD Earliest scheduled start: Processing (date)
144 Table/Structure Field  AFVV - FSSBD Earliest scheduled start: Processing (date)
145 Table/Structure Field  AFVV - FSSBZ Earliest scheduled start: Processing (time)
146 Table/Structure Field  AFVV - FSSBZ Earliest scheduled start: Processing (time)
147 Table/Structure Field  AFVV - FSSLD Earliest scheduled start: Wait (date)
148 Table/Structure Field  AFVV - FSSLD Earliest scheduled start: Wait (date)
149 Table/Structure Field  AFVV - FSSLZ Earliest scheduled start: Wait (time)
150 Table/Structure Field  AFVV - FSSLZ Earliest scheduled start: Wait (time)
151 Table/Structure Field  AFVV - IEAVD Actual finish of operation (date)
152 Table/Structure Field  AFVV - IEAVD Actual finish of operation (date)
153 Table/Structure Field  AFVV - IEBD Actual finish: Processing (date)
154 Table/Structure Field  AFVV - IEBD Actual finish: Processing (date)
155 Table/Structure Field  AFVV - IEBZ Actual processing finish (time)
156 Table/Structure Field  AFVV - IEBZ Actual processing finish (time)
157 Table/Structure Field  AFVV - IEDD Actual finish: Execution (date)
158 Table/Structure Field  AFVV - IEDD Actual finish: Execution (date)
159 Table/Structure Field  AFVV - IEDZ Actual finish: Execution (time)
160 Table/Structure Field  AFVV - IEDZ Actual finish: Execution (time)
161 Table/Structure Field  AFVV - IERD Actual finish: Setup (date)
162 Table/Structure Field  AFVV - IERD Actual finish: Setup (date)
163 Table/Structure Field  AFVV - IERZ Actual finish: Setup (time)
164 Table/Structure Field  AFVV - IERZ Actual finish: Setup (time)
165 Table/Structure Field  AFVV - ISAD Actual start: Teardown (date)
166 Table/Structure Field  AFVV - ISAD Actual start: Teardown (date)
167 Table/Structure Field  AFVV - ISAVD Actual operation start (date)
168 Table/Structure Field  AFVV - ISAVD Actual operation start (date)
169 Table/Structure Field  AFVV - ISAZ Actual start: Teardown (time)
170 Table/Structure Field  AFVV - ISAZ Actual start: Teardown (time)
171 Table/Structure Field  AFVV - ISBD Actual start: Processing (date)
172 Table/Structure Field  AFVV - ISBD Actual start: Processing (date)
173 Table/Structure Field  AFVV - ISBZ Actual start: Processing (time)
174 Table/Structure Field  AFVV - ISBZ Actual start: Processing (time)
175 Table/Structure Field  AFVV - ISDD Actual start: Execution (date)
176 Table/Structure Field  AFVV - ISDD Actual start: Execution (date)
177 Table/Structure Field  AFVV - ISDZ Actual start: Execution/setup (time)
178 Table/Structure Field  AFVV - ISDZ Actual start: Execution/setup (time)
179 Table/Structure Field  AFVV - ISMNW Actual work
180 Table/Structure Field  AFVV - ISMNW Actual work
181 Table/Structure Field  AFVV - NTANF Constraint for activity start (Basic)
182 Table/Structure Field  AFVV - NTANF Constraint for activity start (Basic)
183 Table/Structure Field  AFVV - NTANZ Constraint for activity start time (Basic)
184 Table/Structure Field  AFVV - NTANZ Constraint for activity start time (Basic)
185 Table/Structure Field  AFVV - NTEND Constraint for finish of activity (Basic)
186 Table/Structure Field  AFVV - NTEND Constraint for finish of activity (Basic)
187 Table/Structure Field  AFVV - NTENZ Basic finish time of the activity
188 Table/Structure Field  AFVV - NTENZ Basic finish time of the activity
189 Table/Structure Field  AFVV - PDAE Unit of the forecasted duration from the confirmation
190 Table/Structure Field  AFVV - PDAE Unit of the forecasted duration from the confirmation
191 Table/Structure Field  AFVV - PDAU Forecasted duration of activity from confirmation
192 Table/Structure Field  AFVV - PDAU Forecasted duration of activity from confirmation
193 Table/Structure Field  AFVV - PEDD Forecast finish date of operation from confirmation
194 Table/Structure Field  AFVV - PEDD Forecast finish date of operation from confirmation
195 Table/Structure Field  AFVV - PEDZ Forecast finish time of operation from confirmation
196 Table/Structure Field  AFVV - PEDZ Forecast finish time of operation from confirmation
197 Table/Structure Field  AFVV - PLIFZ Planned delivery time in days
198 Table/Structure Field  AFVV - PLIFZ Planned delivery time in days
199 Table/Structure Field  AFVV - PUFFP Free float (from forecast)
200 Table/Structure Field  AFVV - PUFFP Free float (from forecast)
201 Table/Structure Field  AFVV - PUFFR Free float
202 Table/Structure Field  AFVV - PUFFR Free float
203 Table/Structure Field  AFVV - PUFGP Total float (from forecast)
204 Table/Structure Field  AFVV - PUFGP Total float (from forecast)
205 Table/Structure Field  AFVV - PUFGS Total float
206 Table/Structure Field  AFVV - PUFGS Total float
207 Table/Structure Field  AFVV - RSTZE Unit of measure for setup time
208 Table/Structure Field  AFVV - RSTZE Unit of measure for setup time
209 Table/Structure Field  AFVV - RUEST Setup time
210 Table/Structure Field  AFVV - RUEST Setup time
211 Table/Structure Field  AFVV - SPAVD Latest scheduled start date (forecast)
212 Table/Structure Field  AFVV - SPAVD Latest scheduled start date (forecast)
213 Table/Structure Field  AFVV - SPAVZ Latest scheduled start time (forecast)
214 Table/Structure Field  AFVV - SPAVZ Latest scheduled start time (forecast)
215 Table/Structure Field  AFVV - SPEDD Latest scheduled finish date (forecast)
216 Table/Structure Field  AFVV - SPEDD Latest scheduled finish date (forecast)
217 Table/Structure Field  AFVV - SPEDZ Latest scheduled finish time (forecast)
218 Table/Structure Field  AFVV - SPEDZ Latest scheduled finish time (forecast)
219 Table/Structure Field  AFVV - SSAVD Latest scheduled start: Execution (date)
220 Table/Structure Field  AFVV - SSAVD Latest scheduled start: Execution (date)
221 Table/Structure Field  AFVV - SSAVZ Latest scheduled start: Execution (time)
222 Table/Structure Field  AFVV - SSAVZ Latest scheduled start: Execution (time)
223 Table/Structure Field  AFVV - SSEDD Latest scheduled finish: Execution (date)
224 Table/Structure Field  AFVV - SSEDD Latest scheduled finish: Execution (date)
225 Table/Structure Field  AFVV - SSEDZ Latest scheduled finish: Execution (time)
226 Table/Structure Field  AFVV - SSEDZ Latest scheduled finish: Execution (time)
227 Table/Structure Field  AFVV - SSELD Latest scheduled finish: Wait time (date)
228 Table/Structure Field  AFVV - SSELD Latest scheduled finish: Wait time (date)
229 Table/Structure Field  AFVV - SSELZ Latest scheduled finish: Wait time
230 Table/Structure Field  AFVV - SSELZ Latest scheduled finish: Wait time
231 Table/Structure Field  AFVV - SSSAD Latest scheduled start: Teardown (date)
232 Table/Structure Field  AFVV - SSSAD Latest scheduled start: Teardown (date)
233 Table/Structure Field  AFVV - SSSAZ Latest scheduled start: Teardown (time)
234 Table/Structure Field  AFVV - SSSAZ Latest scheduled start: Teardown (time)
235 Table/Structure Field  AFVV - SSSBD Latest scheduled start: Processing (date)
236 Table/Structure Field  AFVV - SSSBD Latest scheduled start: Processing (date)
237 Table/Structure Field  AFVV - SSSBZ Latest scheduled start: Processing (time)
238 Table/Structure Field  AFVV - SSSBZ Latest scheduled start: Processing (time)
239 Table/Structure Field  AFVV - SSSLD Latest scheduled start: Wait time (date)
240 Table/Structure Field  AFVV - SSSLD Latest scheduled start: Wait time (date)
241 Table/Structure Field  AFVV - SSSLZ Latest scheduled start: Wait time
242 Table/Structure Field  AFVV - SSSLZ Latest scheduled start: Wait time
243 Table/Structure Field  AUFK - AEDAT Change date for Order Master
244 Table/Structure Field  AUFK - AEDAT Change date for Order Master
245 Table/Structure Field  AUFK - AUTYP Order category
246 Table/Structure Field  AUFK - AUTYP Order category
247 Table/Structure Field  AUFK - ERDAT Created on
248 Table/Structure Field  AUFK - ERDAT Created on
249 Table/Structure Field  AUFK - KOKRS Controlling Area
250 Table/Structure Field  AUFK - KOKRS Controlling Area
251 Table/Structure Field  AUFK - PSPEL Work breakdown structure element (WBS element)
252 Table/Structure Field  AUFK - PSPEL Work breakdown structure element (WBS element)