Table/Structure Field list used by SAP ABAP Program RCNSOFST (Project info system: Form routines data selection, structure table)
SAP ABAP Program RCNSOFST (Project info system: Form routines data selection, structure table) is using
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  ACT01 - SUMNR Node number of the superior operation
2 Table/Structure Field  ACTR - ABARBA Confirmation: Degree of processing
3 Table/Structure Field  ACTR - ABARBD Confirmation: Degree of processing
4 Table/Structure Field  ACTR - ARBEH Unit for work
5 Table/Structure Field  ACTR - ARBEI Work involved in the activity
6 Table/Structure Field  ACTR - AUFNR Order/Network number
7 Table/Structure Field  ACTR - DAUNE Normal duration/unit
8 Table/Structure Field  ACTR - DAUNO Normal duration of the activity
9 Table/Structure Field  ACTR - EVGEW Aggregation weight for POC (PS progress)
10 Table/Structure Field  ACTR - EWDAN Normal duration (from forecast) of activity
11 Table/Structure Field  ACTR - EWDNE Unit for forecast normal duration
12 Table/Structure Field  ACTR - EWEND Forecast finish date
13 Table/Structure Field  ACTR - EWSTD Forecasted start date for the activity
14 Table/Structure Field  ACTR - FPAVD Earliest scheduled start date (forecast)
15 Table/Structure Field  ACTR - FPEDD Earliest scheduled finish date (forecast)
16 Table/Structure Field  ACTR - FSAVD Earliest scheduled start: Execution (date)
17 Table/Structure Field  ACTR - FSEDD Earliest scheduled finish: Execution (date)
18 Table/Structure Field  ACTR - IDAUE Unit for actual duration
19 Table/Structure Field  ACTR - IDAUR Actual duration for confirmation
20 Table/Structure Field  ACTR - IEDD Actual finish: Execution (date)
21 Table/Structure Field  ACTR - ISDD Actual start: Execution (date)
22 Table/Structure Field  ACTR - ISMNW Actual work
23 Table/Structure Field  ACTR - LTXA1 Operation short text
24 Table/Structure Field  ACTR - NPRIO Priority
25 Table/Structure Field  ACTR - NTANF Constraint for activity start (Basic)
26 Table/Structure Field  ACTR - NTEND Constraint for finish of activity (Basic)
27 Table/Structure Field  ACTR - ODAUE Unit for remaining duration
28 Table/Structure Field  ACTR - ODAUR Remaining duration of activity
29 Table/Structure Field  ACTR - OFMNW Forecasted work (actual + remaining)
30 Table/Structure Field  ACTR - PEDD Forecast finish date of operation from confirmation
31 Table/Structure Field  ACTR - REMNE Unit for work
32 Table/Structure Field  ACTR - REMNW Remaining Work
33 Table/Structure Field  ACTR - SPAVD Latest scheduled start date (forecast)
34 Table/Structure Field  ACTR - SPEDD Latest scheduled finish date (forecast)
35 Table/Structure Field  ACTR - SSAVD Latest scheduled start: Execution (date)
36 Table/Structure Field  ACTR - SSEDD Latest scheduled finish: Execution (date)
37 Table/Structure Field  ACTR - UVORN Activity element number (work/external/general costs)
38 Table/Structure Field  ACTR - VGTYP Activity or element category
39 Table/Structure Field  ACTR - VORNR Activity number in network and standard network
40 Table/Structure Field  AFABR - AUFNR2 Order/Network number
41 Table/Structure Field  AFABR - FEABD Earliest finish date for the relationship
42 Table/Structure Field  AFABR - FSABD Earliest start date for the relationship
43 Table/Structure Field  AFABR - LTXA12 Operation short text
44 Table/Structure Field  AFABR - NCH Single-Character Flag
45 Table/Structure Field  AFABR - SEABD Latest finish date of the relationship
46 Table/Structure Field  AFABR - SSABD Latest start date of the relationship
47 Table/Structure Field  AFABR - VORNR2 Activity number in network and standard network
48 Table/Structure Field  AFFH - PSNFH Item Number for Production Resource/Tool
49 Table/Structure Field  AFFHR - FEFHD Earliest scheduled finish (date) of PRT usage
50 Table/Structure Field  AFFHR - FHKTX Description of the production resource/tool
51 Table/Structure Field  AFFHR - FHMAR Production resources/tools category
52 Table/Structure Field  AFFHR - FHMNR Production resource/tool number
53 Table/Structure Field  AFFHR - FHWRK Production resources/tools in plant
54 Table/Structure Field  AFFHR - FSFHD Earliest scheduled start (date) for PRT usage
55 Table/Structure Field  AFFHR - IEFHD Actual finish (date) of PRT usage
56 Table/Structure Field  AFFHR - ISFHD Actual start (date) of PRT usage
57 Table/Structure Field  AFFHR - PSNFH Item Number for Production Resource/Tool
58 Table/Structure Field  AFFHR - SEFHD Latest scheduled finish (date) of PRT usage
59 Table/Structure Field  AFFHR - SSFHD Latest scheduled start (date) for PRT usage
60 Table/Structure Field  AFFH_INC - PSNFH Item Number for Production Resource/Tool
61 Table/Structure Field  AFKO - GETRI Confirmed Order Finish Date
62 Table/Structure Field  AFKO - GLTRI Actual finish date
63 Table/Structure Field  AFKO_INC - GETRI Confirmed Order Finish Date
64 Table/Structure Field  AFKO_INC - GLTRI Actual finish date
65 Table/Structure Field  AFRU - ARBID Object ID
66 Table/Structure Field  AFRU - MANDT Client
67 Table/Structure Field  AFRU01 - ARBID Object ID
68 Table/Structure Field  AFRU01 - MANDT Client
69 Table/Structure Field  AFRUR - ABARB Confirmation: Degree of processing
70 Table/Structure Field  AFRUR - AUFNR Order/Network number
71 Table/Structure Field  AFRUR - IEDD Actual finish: Execution (date)
72 Table/Structure Field  AFRUR - IEDZ Actual finish: Execution (time)
73 Table/Structure Field  AFRUR - ISDD Actual start: Execution (date)
74 Table/Structure Field  AFRUR - ISDZ Actual start: Execution/setup (time)
75 Table/Structure Field  AFRUR - ISMNE Unit for work
76 Table/Structure Field  AFRUR - ISMNW Actual work
77 Table/Structure Field  AFRUR - LTXA1 Confirmation text
78 Table/Structure Field  AFRUR - ODAUE Unit for remaining duration
79 Table/Structure Field  AFRUR - ODAUR Remaining duration
80 Table/Structure Field  AFRUR - OFMNE Unit for work
81 Table/Structure Field  AFRUR - OFMNW Remaining work
82 Table/Structure Field  AFRUR - PEDD Forecast finish date of operation from confirmation
83 Table/Structure Field  AFRUR - RMZHL Confirmation counter
84 Table/Structure Field  AFRUR - SPLIT Split number
85 Table/Structure Field  AFRUR - STZHL Confirmation counter of cancelled confirmation
86 Table/Structure Field  AFRUR - UVORN Activity element number (work/external/general costs)
87 Table/Structure Field  AFRUR - VORNR Activity number in network and standard network
88 Table/Structure Field  AFVGD - SUMNR Node number of the superior operation
89 Table/Structure Field  AFVGI - SUMNR Node number of the superior operation
90 Table/Structure Field  AUFK - AUTYP Order category
91 Table/Structure Field  AUFKR - APRIO Order priority
92 Table/Structure Field  AUFKR - AUFNR Order Number
93 Table/Structure Field  AUFKR - DISPO MRP controller for the order
94 Table/Structure Field  AUFKR - DSNAM Name of MRP controller
95 Table/Structure Field  AUFKR - GLTPP Finish date (forecast)
96 Table/Structure Field  AUFKR - GLTPS Scheduled forecast finish
97 Table/Structure Field  AUFKR - GLTRI Actual finish date
98 Table/Structure Field  AUFKR - GLTRP Basic finish date
99 Table/Structure Field  AUFKR - GLTRS Scheduled finish
100 Table/Structure Field  AUFKR - GSTPP Forecast start date
101 Table/Structure Field  AUFKR - GSTPS Scheduled forecast start
102 Table/Structure Field  AUFKR - GSTRI Actual start date
103 Table/Structure Field  AUFKR - GSTRP Basic start date
104 Table/Structure Field  AUFKR - GSTRS Scheduled start
105 Table/Structure Field  AUFKR - KTEXT Description
106 Table/Structure Field  AUFKR - LTEXT Long Text Exists
107 Table/Structure Field  AUFKR - MATNR Material Number for Order
108 Table/Structure Field  CRHD - OBJID Object ID of the resource
109 Table/Structure Field  DRAD - DOKAR Document Type
110 Table/Structure Field  DRAD - DOKNR Document number
111 Table/Structure Field  DRAD - DOKTL Document part
112 Table/Structure Field  DRAD - DOKVR Document version
113 Table/Structure Field  DRAT - DKTXT Document description
114 Table/Structure Field  ELM_PS - KOKRS Controlling Area
115 Table/Structure Field  ELM_PS - KOSTL Cost Center
116 Table/Structure Field  ELM_PS - KTEXT Description
117 Table/Structure Field  ELM_PS - OBJNR Object number
118 Table/Structure Field  ELM_PS - OBTYP Node type
119 Table/Structure Field  ELM_PS - PRCTR Profit Center
120 Table/Structure Field  IMPR - OBJNR CO object number for inv. prog. position
121 Table/Structure Field  IMPR - POSID Identification for an investment program position
122 Table/Structure Field  IMTP - PRNAM Investment program name
123 Table/Structure Field  KBED - CANUMF Counter for the main capacity requirements record
124 Table/Structure Field  KBED01 - CANUMF Counter for the main capacity requirements record
125 Table/Structure Field  KBEDI - CANUMF Counter for the main capacity requirements record
126 Table/Structure Field  KBEDR - ABARBA Confirmation: Degree of processing
127 Table/Structure Field  KBEDR - ABARBD Confirmation: Degree of processing
128 Table/Structure Field  KBEDR - ARBEH Unit for work
129 Table/Structure Field  KBEDR - ARBEI Work involved in the activity
130 Table/Structure Field  KBEDR - ARBPL Work center
131 Table/Structure Field  KBEDR - DAUNE Normal duration/unit
132 Table/Structure Field  KBEDR - DAUNO Normal duration of the activity
133 Table/Structure Field  KBEDR - FENDD Earliest finish /date
134 Table/Structure Field  KBEDR - FRUEHER Actual start is before earliest scheduled start
135 Table/Structure Field  KBEDR - FSTAD Earliest start / date
136 Table/Structure Field  KBEDR - IDAUE Unit for actual duration
137 Table/Structure Field  KBEDR - IDAUR Actual duration for confirmation
138 Table/Structure Field  KBEDR - IENDD Actual finish / date
139 Table/Structure Field  KBEDR - ISMNW Actual work
140 Table/Structure Field  KBEDR - ISTAD Actual start / date
141 Table/Structure Field  KBEDR - KAPAR Capacity category
142 Table/Structure Field  KBEDR - KAPTXT Capacity short text
143 Table/Structure Field  KBEDR - ODAUE Unit for remaining duration
144 Table/Structure Field  KBEDR - ODAUR Remaining duration of activity
145 Table/Structure Field  KBEDR - OFMNW Forecasted work (actual + remaining)
146 Table/Structure Field  KBEDR - PDAE Unit of the forecasted duration from the confirmation
147 Table/Structure Field  KBEDR - PDAU Forecasted duration of activity from confirmation
148 Table/Structure Field  KBEDR - PENDD Forecast finish / date
149 Table/Structure Field  KBEDR - PERNR Personnel Number
150 Table/Structure Field  KBEDR - PLNUM Planned order number
151 Table/Structure Field  KBEDR - REMNE Unit for work
152 Table/Structure Field  KBEDR - REMNW Remaining work
153 Table/Structure Field  KBEDR - SENDD Latest finish / date
154 Table/Structure Field  KBEDR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
155 Table/Structure Field  KBEDR - SPLIT Split number
156 Table/Structure Field  KBEDR - SSTAD Latest start / date
157 Table/Structure Field  KBEDR - USE04 User field: Unit for quantity fields
158 Table/Structure Field  KBEDR - USE05 User field: Unit for quantity fields
159 Table/Structure Field  KBEDR - USR04 User field for quantity (length 10.3)
160 Table/Structure Field  KBEDR - USR05 User field for quantity (length 10.3)
161 Table/Structure Field  KBEDR - VEINH Unit for Duration of the Delay
162 Table/Structure Field  KBEDR - VERZUG Duration After Latest Scheduled Finish
163 Table/Structure Field  KBEDR - VORBEI Duration After Earliest Scheduled Start
164 Table/Structure Field  KBEDR - WERKS Plant
165 Table/Structure Field  KKHIE - STUFE CO-PC Hierarchy Level
166 Table/Structure Field  KKRVDCOOBJ - OBJNR Object number
167 Table/Structure Field  KKRVDCOOBJ - VARHIEBG Variable hierarchy code (CO object summarization)
168 Table/Structure Field  MLSTR - EDATU Fixed milestone date (basic)
169 Table/Structure Field  MLSTR - KTEXT Description
170 Table/Structure Field  MLSTR - LST_ACTDT Actual date (Milestone met)
171 Table/Structure Field  MLSTR - LTXSP Language: The long text was stored in this language
172 Table/Structure Field  MLSTR - MLST_ZAEHL Number of milestone
173 Table/Structure Field  MLSTR - PDATU Fixed milestone date (F)
174 Table/Structure Field  MLSTR - TEDAT Scheduled milestone date (Basic)
175 Table/Structure Field  MLSTR - TPDAT Scheduled milestone date (Forecast)
176 Table/Structure Field  NETZR - APRIO Order priority
177 Table/Structure Field  NETZR - AUFNR Network number
178 Table/Structure Field  NETZR - DISPO MRP controller for the order
179 Table/Structure Field  NETZR - DSNAM Name of MRP controller
180 Table/Structure Field  NETZR - GETRI Confirmed Order Finish Date
181 Table/Structure Field  NETZR - GLTPP Finish date (forecast)
182 Table/Structure Field  NETZR - GLTPS Scheduled forecast finish
183 Table/Structure Field  NETZR - GLTRP Basic finish date
184 Table/Structure Field  NETZR - GLTRS Scheduled finish
185 Table/Structure Field  NETZR - GSTPP Forecast start date
186 Table/Structure Field  NETZR - GSTPS Scheduled forecast start
187 Table/Structure Field  NETZR - GSTRI Actual start date
188 Table/Structure Field  NETZR - GSTRP Basic start date
189 Table/Structure Field  NETZR - GSTRS Scheduled start
190 Table/Structure Field  NETZR - KTEXT Description
191 Table/Structure Field  NETZR - LTEXT Long Text Exists
192 Table/Structure Field  PLAF - PLNUM Planned order number
193 Table/Structure Field  PLAFR - MTEXT Material description
194 Table/Structure Field  PLAFR - PEDTR Order finish date in the planned order
195 Table/Structure Field  PLAFR - PLNUM Planned order number
196 Table/Structure Field  PLAFR - PLWRK Planning Plant
197 Table/Structure Field  PLAFR - PSTTR Order start date in planned order
198 Table/Structure Field  PLAFR - PWWRK Production plant in planned order
199 Table/Structure Field  PROJR - KALID Factory calendar key
200 Table/Structure Field  PROJR - PLFAZ Project planned start date
201 Table/Structure Field  PROJR - PLSEZ Project planned finish date
202 Table/Structure Field  PROJR - POST1 PS: Short description (first text line)
203 Table/Structure Field  PROJR - PSPID Project definition
204 Table/Structure Field  PROJR - PWHIE WBS currency (project definition)
205 Table/Structure Field  PROJR - VBUKR Company code for the project
206 Table/Structure Field  PROJR - VGSBR Business area for the project
207 Table/Structure Field  PROJR - VKOKR Controlling area for the project
208 Table/Structure Field  PRPSR - EDAUR Duration
209 Table/Structure Field  PRPSR - EEINH Unit for the length (duration) of the WBS element
210 Table/Structure Field  PRPSR - EENDE Forecasted finish date of the WBS element
211 Table/Structure Field  PRPSR - EETRM Scheduled finish date (Forecast)
212 Table/Structure Field  PRPSR - ESTRM Scheduled start date (Forecast)
213 Table/Structure Field  PRPSR - ESTRT Forecasted start date of the WBS element
214 Table/Structure Field  PRPSR - EVGEW Aggregation weight for POC (PS progress)
215 Table/Structure Field  PRPSR - FABKL Calendar for the dates in the WBS element
216 Table/Structure Field  PRPSR - IDAUR Actual duration
217 Table/Structure Field  PRPSR - IEINH Unit for the length (duration) of the WBS element
218 Table/Structure Field  PRPSR - IENDE Actual finish date of the WBS element
219 Table/Structure Field  PRPSR - ISTRT Actual start date for the WBS element
220 Table/Structure Field  PRPSR - PBUKR Company code for WBS element
221 Table/Structure Field  PRPSR - PDAUR Forecast duration
222 Table/Structure Field  PRPSR - PEINH Unit for the length (duration) of the WBS element
223 Table/Structure Field  PRPSR - PENDE WBS element: Basic finish date
224 Table/Structure Field  PRPSR - PGSBR Business area for WBS element
225 Table/Structure Field  PRPSR - PKOKR Controlling area for WBS element
226 Table/Structure Field  PRPSR - POSID Work Breakdown Structure Element (WBS Element)
227 Table/Structure Field  PRPSR - POST1 PS: Short description (first text line)
228 Table/Structure Field  PRPSR - PSTRM Scheduled start (Basic)
229 Table/Structure Field  PRPSR - PSTRT WBS element: Basic start date
230 Table/Structure Field  PRPSR - PWPOS WBS element currency
231 Table/Structure Field  PRPSR - STUFE Level in project hierarchy
232 Table/Structure Field  PRPSR - VIEND Tentative actual finish date for WBS element
233 Table/Structure Field  PRPSR - VISTR Tentative actual start date for WBS element
234 Table/Structure Field  PRTE - EETRF Earliest scheduled finish date (forecast)
235 Table/Structure Field  PRTE - ESTRS Latest scheduled start date (forecast)
236 Table/Structure Field  PRTE - PETRF Earliest scheduled finish date (basic)
237 Table/Structure Field  PRTE - PETRM Scheduled finish (Basic)
238 Table/Structure Field  PRTE - PSTRS Latest scheduled start date (basic)
239 Table/Structure Field  PRTEINC - EETRF PRTEINC-EETRF
240 Table/Structure Field  PRTEINC - ESTRS PRTEINC-ESTRS
241 Table/Structure Field  PRTEINC - PETRF PRTEINC-PETRF
242 Table/Structure Field  PRTEINC - PETRM Scheduled finish (Basic)
243 Table/Structure Field  PRTEINC - PSTRS PRTEINC-PSTRS
244 Table/Structure Field  PSTXR - TXTAR Text type
245 Table/Structure Field  PSTXR - TXTTI PS text description
246 Table/Structure Field  RCRKK - KALID Factory Calendar
247 Table/Structure Field  RESBR - APOSN BOM item number
248 Table/Structure Field  RESBR - AUFNR Order/Network number
249 Table/Structure Field  RESBR - BANFNR Purchase requisition number
250 Table/Structure Field  RESBR - BANFPO Item number of purchase requisition
251 Table/Structure Field  RESBR - BDTER Requirements date for the component
252 Table/Structure Field  RESBR - KZBWS Valuation of Special Stock
253 Table/Structure Field  RESBR - MATNR Material Number
254 Table/Structure Field  RESBR - MTEXT Material description
255 Table/Structure Field  RESBR - PLNUM Planned order number
256 Table/Structure Field  RESBR - POSTP Item category (bill of material)
257 Table/Structure Field  RESBR - POTX1 BOM Item Text (Line 1)
258 Table/Structure Field  RESBR - RSNUM Number of reservation/dependent requirements
259 Table/Structure Field  RESBR - RSPOS Item Number of Reservation / Dependent Requirements
260 Table/Structure Field  RESBR - VORNR Activity number in network and standard network
261 Table/Structure Field  RSTHIE - ID Internal: Node ID
262 Table/Structure Field  RSTHIE - NAME Name of a Hierarchy Object
263 Table/Structure Field  RSTHIE - TLEVEL Node level
264 Table/Structure Field  RSTHIE - TYPE Node type
265 Table/Structure Field  STRUCR - ABARBA Percent of completion for work
266 Table/Structure Field  STRUCR - ABARBD Processing % of duration
267 Table/Structure Field  STRUCR - BUKRS Company Code
268 Table/Structure Field  STRUCR - DATFS Earliest start date
269 Table/Structure Field  STRUCR - DATSE Latest finish date
270 Table/Structure Field  STRUCR - EARBEH Unit for work
271 Table/Structure Field  STRUCR - EARBEI Work
272 Table/Structure Field  STRUCR - ECKEN Finish date (from basic dates)
273 Table/Structure Field  STRUCR - ECKST Basic start date
274 Table/Structure Field  STRUCR - EDAUEH Actual duration unit
275 Table/Structure Field  STRUCR - EDAUER Duration
276 Table/Structure Field  STRUCR - EVGEW Aggregation weight for POC (PS progress)
277 Table/Structure Field  STRUCR - FRUEHER Actual start is before earliest scheduled start
278 Table/Structure Field  STRUCR - GSBER Business Area
279 Table/Structure Field  STRUCR - IARBEH Unit for work
280 Table/Structure Field  STRUCR - IARBEI Actual work
281 Table/Structure Field  STRUCR - IDAUEH Actual duration unit
282 Table/Structure Field  STRUCR - IDAUER Actual duration
283 Table/Structure Field  STRUCR - ISTEN Actual finish date
284 Table/Structure Field  STRUCR - ISTST Actual start date
285 Table/Structure Field  STRUCR - KALID Factory Calendar
286 Table/Structure Field  STRUCR - KOKRS Controlling Area
287 Table/Structure Field  STRUCR - KURZTEXT Short text/description of the object
288 Table/Structure Field  STRUCR - OBJEKTID ID/Object key
289 Table/Structure Field  STRUCR - OBJEKTTYP Object Type Text
290 Table/Structure Field  STRUCR - PARBEH Unit for work
291 Table/Structure Field  STRUCR - PARBEI Forecast work
292 Table/Structure Field  STRUCR - PDAUEH Actual duration unit
293 Table/Structure Field  STRUCR - PDAUER Forecast duration
294 Table/Structure Field  STRUCR - PROGEN Forecast finish date
295 Table/Structure Field  STRUCR - PROGST Forecast start date
296 Table/Structure Field  STRUCR - PSPRI Priority
297 Table/Structure Field  STRUCR - RARBEH Unit for work
298 Table/Structure Field  STRUCR - RARBEI Remaining work
299 Table/Structure Field  STRUCR - RDAUEH Actual duration unit
300 Table/Structure Field  STRUCR - RDAUER Remaining duration
301 Table/Structure Field  STRUCR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
302 Table/Structure Field  STRUCR - STATXT Edited status text
303 Table/Structure Field  STRUCR - TEENFR Earliest scheduled finish (from basic dates)
304 Table/Structure Field  STRUCR - TEENSP Latest scheduled finish (from basic dates)
305 Table/Structure Field  STRUCR - TESTFR Earliest scheduled start (from basic dates)
306 Table/Structure Field  STRUCR - TESTSP Latest scheduled start (from basic dates)
307 Table/Structure Field  STRUCR - TPENFR Earliest scheduled finish (from forecast dates)
308 Table/Structure Field  STRUCR - TPENSP Latest scheduled finish (from forecast dates)
309 Table/Structure Field  STRUCR - TPSTFR Earliest scheduled start (from forecast dates)
310 Table/Structure Field  STRUCR - TPSTSP Latest scheduled start (from forecast dates)
311 Table/Structure Field  STRUCR - TXTSP Language: The long text was stored in this language
312 Table/Structure Field  STRUCR - USE04 User field: Unit for quantity fields
313 Table/Structure Field  STRUCR - USE05 User field: Unit for quantity fields
314 Table/Structure Field  STRUCR - USR04 User field for quantity (length 10.3)
315 Table/Structure Field  STRUCR - USR05 User field for quantity (length 10.3)
316 Table/Structure Field  STRUCR - VARBEH Unit for work
317 Table/Structure Field  STRUCR - VARBEI Tentative work
318 Table/Structure Field  STRUCR - VDAUEH Actual duration unit
319 Table/Structure Field  STRUCR - VDAUER Tentative duration
320 Table/Structure Field  STRUCR - VEINH Unit for Duration of the Delay
321 Table/Structure Field  STRUCR - VERNA Name of responsible person (Project manager)
322 Table/Structure Field  STRUCR - VERNR Number of responsible person (project mgr)/MRP controller
323 Table/Structure Field  STRUCR - VERZUG Duration After Latest Scheduled Finish
324 Table/Structure Field  STRUCR - VORBEI Duration After Earliest Scheduled Start
325 Table/Structure Field  STRUCR - VORLEN Tentative finish date
326 Table/Structure Field  STRUCR - VORLST Tentative start date
327 Table/Structure Field  STRUCR - WAERS Currency Key
328 Table/Structure Field  STRUCR - WERKS Plant
329 Table/Structure Field  STRUCR_AFTER_RPSCO - EVGEW Aggregation weight for POC (PS progress)
330 Table/Structure Field  STRUCR_BEFORE_DATES - KURZTEXT Short text/description of the object
331 Table/Structure Field  STRUCR_BEFORE_DATES - OBJEKTID ID/Object key
332 Table/Structure Field  STRUCR_BEFORE_DATES - OBJEKTTYP Object Type Text
333 Table/Structure Field  STRUCR_BEFORE_RPSCO - BUKRS Company Code
334 Table/Structure Field  STRUCR_BEFORE_RPSCO - FRUEHER Actual start is before earliest scheduled start
335 Table/Structure Field  STRUCR_BEFORE_RPSCO - GSBER Business Area
336 Table/Structure Field  STRUCR_BEFORE_RPSCO - KALID Factory Calendar
337 Table/Structure Field  STRUCR_BEFORE_RPSCO - KOKRS Controlling Area
338 Table/Structure Field  STRUCR_BEFORE_RPSCO - PSPRI Priority
339 Table/Structure Field  STRUCR_BEFORE_RPSCO - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
340 Table/Structure Field  STRUCR_BEFORE_RPSCO - STATXT Edited status text
341 Table/Structure Field  STRUCR_BEFORE_RPSCO - TXTSP Language: The long text was stored in this language
342 Table/Structure Field  STRUCR_BEFORE_RPSCO - VEINH Unit for Duration of the Delay
343 Table/Structure Field  STRUCR_BEFORE_RPSCO - VERNA Name of responsible person (Project manager)
344 Table/Structure Field  STRUCR_BEFORE_RPSCO - VERNR Number of responsible person (project mgr)/MRP controller
345 Table/Structure Field  STRUCR_BEFORE_RPSCO - VERZUG Duration After Latest Scheduled Finish
346 Table/Structure Field  STRUCR_BEFORE_RPSCO - VORBEI Duration After Earliest Scheduled Start
347 Table/Structure Field  STRUCR_BEFORE_RPSCO - WAERS Currency Key
348 Table/Structure Field  STRUCR_BEFORE_RPSCO - WERKS Plant
349 Table/Structure Field  STRUCR_BEFORE_USER - ABARBA Percent of completion for work
350 Table/Structure Field  STRUCR_BEFORE_WORK - ABARBD Processing % of duration
351 Table/Structure Field  STRUCR_BEFORE_WORK - EDAUEH Actual duration unit
352 Table/Structure Field  STRUCR_BEFORE_WORK - EDAUER Duration
353 Table/Structure Field  STRUCR_BEFORE_WORK - IDAUEH Actual duration unit
354 Table/Structure Field  STRUCR_BEFORE_WORK - IDAUER Actual duration
355 Table/Structure Field  STRUCR_BEFORE_WORK - PDAUEH Actual duration unit
356 Table/Structure Field  STRUCR_BEFORE_WORK - PDAUER Forecast duration
357 Table/Structure Field  STRUCR_BEFORE_WORK - RDAUEH Actual duration unit
358 Table/Structure Field  STRUCR_BEFORE_WORK - RDAUER Remaining duration
359 Table/Structure Field  STRUCR_BEFORE_WORK - VDAUEH Actual duration unit
360 Table/Structure Field  STRUCR_BEFORE_WORK - VDAUER Tentative duration
361 Table/Structure Field  STRUCR_DATES - DATFS Earliest start date
362 Table/Structure Field  STRUCR_DATES - DATSE Latest finish date
363 Table/Structure Field  STRUCR_DATES - ECKEN Finish date (from basic dates)
364 Table/Structure Field  STRUCR_DATES - ECKST Basic start date
365 Table/Structure Field  STRUCR_DATES - ISTEN Actual finish date
366 Table/Structure Field  STRUCR_DATES - ISTST Actual start date
367 Table/Structure Field  STRUCR_DATES - PROGEN Forecast finish date
368 Table/Structure Field  STRUCR_DATES - PROGST Forecast start date
369 Table/Structure Field  STRUCR_DATES - TEENFR Earliest scheduled finish (from basic dates)
370 Table/Structure Field  STRUCR_DATES - TEENSP Latest scheduled finish (from basic dates)
371 Table/Structure Field  STRUCR_DATES - TESTFR Earliest scheduled start (from basic dates)
372 Table/Structure Field  STRUCR_DATES - TESTSP Latest scheduled start (from basic dates)
373 Table/Structure Field  STRUCR_DATES - TPENFR Earliest scheduled finish (from forecast dates)
374 Table/Structure Field  STRUCR_DATES - TPENSP Latest scheduled finish (from forecast dates)
375 Table/Structure Field  STRUCR_DATES - TPSTFR Earliest scheduled start (from forecast dates)
376 Table/Structure Field  STRUCR_DATES - TPSTSP Latest scheduled start (from forecast dates)
377 Table/Structure Field  STRUCR_DATES - VORLEN Tentative finish date
378 Table/Structure Field  STRUCR_DATES - VORLST Tentative start date
379 Table/Structure Field  STRUCR_USER - USE04 User field: Unit for quantity fields
380 Table/Structure Field  STRUCR_USER - USE05 User field: Unit for quantity fields
381 Table/Structure Field  STRUCR_USER - USR04 User field for quantity (length 10.3)
382 Table/Structure Field  STRUCR_USER - USR05 User field for quantity (length 10.3)
383 Table/Structure Field  STRUCR_WORK - EARBEH Unit for work
384 Table/Structure Field  STRUCR_WORK - EARBEI Work
385 Table/Structure Field  STRUCR_WORK - IARBEH Unit for work
386 Table/Structure Field  STRUCR_WORK - IARBEI Actual work
387 Table/Structure Field  STRUCR_WORK - PARBEH Unit for work
388 Table/Structure Field  STRUCR_WORK - PARBEI Forecast work
389 Table/Structure Field  STRUCR_WORK - RARBEH Unit for work
390 Table/Structure Field  STRUCR_WORK - RARBEI Remaining work
391 Table/Structure Field  STRUCR_WORK - VARBEH Unit for work
392 Table/Structure Field  STRUCR_WORK - VARBEI Tentative work
393 Table/Structure Field  SYST - FDPOS ABAP System Field: Occurrence in Byte or Character String
394 Table/Structure Field  SYST - INDEX ABAP System Field: Loop Index
395 Table/Structure Field  SYST - LANGU ABAP System Field: Language Key of Text Environment
396 Table/Structure Field  SYST - MANDT ABAP System Field: Client ID of Current User
397 Table/Structure Field  SYST - TABIX ABAP System Field: Row Index of Internal Tables
398 Table/Structure Field  SYST - TFILL ABAP System Field: Number of Rows in Internal Tables
399 Table/Structure Field  SYST - UZEIT ABAP System Field: Current Time of Application Server
400 Table/Structure Field  T001W - FABKL Factory calendar key
401 Table/Structure Field  T006 - MSEHI Unit of Measurement
402 Table/Structure Field  TCN04 - SPRAS Language Key
403 Table/Structure Field  TCN04 - TXT08 Description for PS text type (8 characters)
404 Table/Structure Field  TCN04 - TXTAR Text type
405 Table/Structure Field  TCNDS - HIERAR Hierarchy Type
406 Table/Structure Field  TCNDS - HIERID Hierarchy ID
407 Table/Structure Field  TKKR1 - FLENGTH Length of Hierarchy Field
408 Table/Structure Field  TKKR1 - HIART Hierarchy Type
409 Table/Structure Field  TKKR1 - IDENT Hierarchy ID
410 Table/Structure Field  TKKR1 - OFFSET Offset of Hierarchy Field
411 Table/Structure Field  TKKR1 - STUFE Number of Hierarchy Level
412 Table/Structure Field  VBAK - OBJNR Object number at header level
413 Table/Structure Field  VBAKR - BUKRS_VF Company code to be billed
414 Table/Structure Field  VBAKR - GUEBG Valid-from date (outline agreements, product proposals)
415 Table/Structure Field  VBAKR - GUEEN Valid-to date (outline agreements, product proposals)
416 Table/Structure Field  VBAKR - KDAUF Sales Document
417 Table/Structure Field  VBAKR - KTEXT Search term for product proposal
418 Table/Structure Field  VBAPR - ARKTX Short text for sales order item
419 Table/Structure Field  VBAPR - KDAUF Sales Document
420 Table/Structure Field  VBAPR - KDPOS Sales Document Item