Table/Structure Field list used by SAP ABAP Program RCNSOFST (Project info system: Form routines data selection, structure table)
SAP ABAP Program RCNSOFST (Project info system: Form routines data selection, structure table) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | ACT01 - SUMNR | Node number of the superior operation | |
2 | Table/Structure Field | ACTR - ABARBA | Confirmation: Degree of processing | |
3 | Table/Structure Field | ACTR - ABARBD | Confirmation: Degree of processing | |
4 | Table/Structure Field | ACTR - ARBEH | Unit for work | |
5 | Table/Structure Field | ACTR - ARBEI | Work involved in the activity | |
6 | Table/Structure Field | ACTR - AUFNR | Order/Network number | |
7 | Table/Structure Field | ACTR - DAUNE | Normal duration/unit | |
8 | Table/Structure Field | ACTR - DAUNO | Normal duration of the activity | |
9 | Table/Structure Field | ACTR - EVGEW | Aggregation weight for POC (PS progress) | |
10 | Table/Structure Field | ACTR - EWDAN | Normal duration (from forecast) of activity | |
11 | Table/Structure Field | ACTR - EWDNE | Unit for forecast normal duration | |
12 | Table/Structure Field | ACTR - EWEND | Forecast finish date | |
13 | Table/Structure Field | ACTR - EWSTD | Forecasted start date for the activity | |
14 | Table/Structure Field | ACTR - FPAVD | Earliest scheduled start date (forecast) | |
15 | Table/Structure Field | ACTR - FPEDD | Earliest scheduled finish date (forecast) | |
16 | Table/Structure Field | ACTR - FSAVD | Earliest scheduled start: Execution (date) | |
17 | Table/Structure Field | ACTR - FSEDD | Earliest scheduled finish: Execution (date) | |
18 | Table/Structure Field | ACTR - IDAUE | Unit for actual duration | |
19 | Table/Structure Field | ACTR - IDAUR | Actual duration for confirmation | |
20 | Table/Structure Field | ACTR - IEDD | Actual finish: Execution (date) | |
21 | Table/Structure Field | ACTR - ISDD | Actual start: Execution (date) | |
22 | Table/Structure Field | ACTR - ISMNW | Actual work | |
23 | Table/Structure Field | ACTR - LTXA1 | Operation short text | |
24 | Table/Structure Field | ACTR - NPRIO | Priority | |
25 | Table/Structure Field | ACTR - NTANF | Constraint for activity start (Basic) | |
26 | Table/Structure Field | ACTR - NTEND | Constraint for finish of activity (Basic) | |
27 | Table/Structure Field | ACTR - ODAUE | Unit for remaining duration | |
28 | Table/Structure Field | ACTR - ODAUR | Remaining duration of activity | |
29 | Table/Structure Field | ACTR - OFMNW | Forecasted work (actual + remaining) | |
30 | Table/Structure Field | ACTR - PEDD | Forecast finish date of operation from confirmation | |
31 | Table/Structure Field | ACTR - REMNE | Unit for work | |
32 | Table/Structure Field | ACTR - REMNW | Remaining Work | |
33 | Table/Structure Field | ACTR - SPAVD | Latest scheduled start date (forecast) | |
34 | Table/Structure Field | ACTR - SPEDD | Latest scheduled finish date (forecast) | |
35 | Table/Structure Field | ACTR - SSAVD | Latest scheduled start: Execution (date) | |
36 | Table/Structure Field | ACTR - SSEDD | Latest scheduled finish: Execution (date) | |
37 | Table/Structure Field | ACTR - UVORN | Activity element number (work/external/general costs) | |
38 | Table/Structure Field | ACTR - VGTYP | Activity or element category | |
39 | Table/Structure Field | ACTR - VORNR | Activity number in network and standard network | |
40 | Table/Structure Field | AFABR - AUFNR2 | Order/Network number | |
41 | Table/Structure Field | AFABR - FEABD | Earliest finish date for the relationship | |
42 | Table/Structure Field | AFABR - FSABD | Earliest start date for the relationship | |
43 | Table/Structure Field | AFABR - LTXA12 | Operation short text | |
44 | Table/Structure Field | AFABR - NCH | Single-Character Flag | |
45 | Table/Structure Field | AFABR - SEABD | Latest finish date of the relationship | |
46 | Table/Structure Field | AFABR - SSABD | Latest start date of the relationship | |
47 | Table/Structure Field | AFABR - VORNR2 | Activity number in network and standard network | |
48 | Table/Structure Field | AFFH - PSNFH | Item Number for Production Resource/Tool | |
49 | Table/Structure Field | AFFHR - FEFHD | Earliest scheduled finish (date) of PRT usage | |
50 | Table/Structure Field | AFFHR - FHKTX | Description of the production resource/tool | |
51 | Table/Structure Field | AFFHR - FHMAR | Production resources/tools category | |
52 | Table/Structure Field | AFFHR - FHMNR | Production resource/tool number | |
53 | Table/Structure Field | AFFHR - FHWRK | Production resources/tools in plant | |
54 | Table/Structure Field | AFFHR - FSFHD | Earliest scheduled start (date) for PRT usage | |
55 | Table/Structure Field | AFFHR - IEFHD | Actual finish (date) of PRT usage | |
56 | Table/Structure Field | AFFHR - ISFHD | Actual start (date) of PRT usage | |
57 | Table/Structure Field | AFFHR - PSNFH | Item Number for Production Resource/Tool | |
58 | Table/Structure Field | AFFHR - SEFHD | Latest scheduled finish (date) of PRT usage | |
59 | Table/Structure Field | AFFHR - SSFHD | Latest scheduled start (date) for PRT usage | |
60 | Table/Structure Field | AFFH_INC - PSNFH | Item Number for Production Resource/Tool | |
61 | Table/Structure Field | AFKO - GETRI | Confirmed Order Finish Date | |
62 | Table/Structure Field | AFKO - GLTRI | Actual finish date | |
63 | Table/Structure Field | AFKO_INC - GETRI | Confirmed Order Finish Date | |
64 | Table/Structure Field | AFKO_INC - GLTRI | Actual finish date | |
65 | Table/Structure Field | AFRU - ARBID | Object ID | |
66 | Table/Structure Field | AFRU - MANDT | Client | |
67 | Table/Structure Field | AFRU01 - ARBID | Object ID | |
68 | Table/Structure Field | AFRU01 - MANDT | Client | |
69 | Table/Structure Field | AFRUR - ABARB | Confirmation: Degree of processing | |
70 | Table/Structure Field | AFRUR - AUFNR | Order/Network number | |
71 | Table/Structure Field | AFRUR - IEDD | Actual finish: Execution (date) | |
72 | Table/Structure Field | AFRUR - IEDZ | Actual finish: Execution (time) | |
73 | Table/Structure Field | AFRUR - ISDD | Actual start: Execution (date) | |
74 | Table/Structure Field | AFRUR - ISDZ | Actual start: Execution/setup (time) | |
75 | Table/Structure Field | AFRUR - ISMNE | Unit for work | |
76 | Table/Structure Field | AFRUR - ISMNW | Actual work | |
77 | Table/Structure Field | AFRUR - LTXA1 | Confirmation text | |
78 | Table/Structure Field | AFRUR - ODAUE | Unit for remaining duration | |
79 | Table/Structure Field | AFRUR - ODAUR | Remaining duration | |
80 | Table/Structure Field | AFRUR - OFMNE | Unit for work | |
81 | Table/Structure Field | AFRUR - OFMNW | Remaining work | |
82 | Table/Structure Field | AFRUR - PEDD | Forecast finish date of operation from confirmation | |
83 | Table/Structure Field | AFRUR - RMZHL | Confirmation counter | |
84 | Table/Structure Field | AFRUR - SPLIT | Split number | |
85 | Table/Structure Field | AFRUR - STZHL | Confirmation counter of cancelled confirmation | |
86 | Table/Structure Field | AFRUR - UVORN | Activity element number (work/external/general costs) | |
87 | Table/Structure Field | AFRUR - VORNR | Activity number in network and standard network | |
88 | Table/Structure Field | AFVGD - SUMNR | Node number of the superior operation | |
89 | Table/Structure Field | AFVGI - SUMNR | Node number of the superior operation | |
90 | Table/Structure Field | AUFK - AUTYP | Order category | |
91 | Table/Structure Field | AUFKR - APRIO | Order priority | |
92 | Table/Structure Field | AUFKR - AUFNR | Order Number | |
93 | Table/Structure Field | AUFKR - DISPO | MRP controller for the order | |
94 | Table/Structure Field | AUFKR - DSNAM | Name of MRP controller | |
95 | Table/Structure Field | AUFKR - GLTPP | Finish date (forecast) | |
96 | Table/Structure Field | AUFKR - GLTPS | Scheduled forecast finish | |
97 | Table/Structure Field | AUFKR - GLTRI | Actual finish date | |
98 | Table/Structure Field | AUFKR - GLTRP | Basic finish date | |
99 | Table/Structure Field | AUFKR - GLTRS | Scheduled finish | |
100 | Table/Structure Field | AUFKR - GSTPP | Forecast start date | |
101 | Table/Structure Field | AUFKR - GSTPS | Scheduled forecast start | |
102 | Table/Structure Field | AUFKR - GSTRI | Actual start date | |
103 | Table/Structure Field | AUFKR - GSTRP | Basic start date | |
104 | Table/Structure Field | AUFKR - GSTRS | Scheduled start | |
105 | Table/Structure Field | AUFKR - KTEXT | Description | |
106 | Table/Structure Field | AUFKR - LTEXT | Long Text Exists | |
107 | Table/Structure Field | AUFKR - MATNR | Material Number for Order | |
108 | Table/Structure Field | CRHD - OBJID | Object ID of the resource | |
109 | Table/Structure Field | DRAD - DOKAR | Document Type | |
110 | Table/Structure Field | DRAD - DOKNR | Document number | |
111 | Table/Structure Field | DRAD - DOKTL | Document part | |
112 | Table/Structure Field | DRAD - DOKVR | Document version | |
113 | Table/Structure Field | DRAT - DKTXT | Document description | |
114 | Table/Structure Field | ELM_PS - KOKRS | Controlling Area | |
115 | Table/Structure Field | ELM_PS - KOSTL | Cost Center | |
116 | Table/Structure Field | ELM_PS - KTEXT | Description | |
117 | Table/Structure Field | ELM_PS - OBJNR | Object number | |
118 | Table/Structure Field | ELM_PS - OBTYP | Node type | |
119 | Table/Structure Field | ELM_PS - PRCTR | Profit Center | |
120 | Table/Structure Field | IMPR - OBJNR | CO object number for inv. prog. position | |
121 | Table/Structure Field | IMPR - POSID | Identification for an investment program position | |
122 | Table/Structure Field | IMTP - PRNAM | Investment program name | |
123 | Table/Structure Field | KBED - CANUMF | Counter for the main capacity requirements record | |
124 | Table/Structure Field | KBED01 - CANUMF | Counter for the main capacity requirements record | |
125 | Table/Structure Field | KBEDI - CANUMF | Counter for the main capacity requirements record | |
126 | Table/Structure Field | KBEDR - ABARBA | Confirmation: Degree of processing | |
127 | Table/Structure Field | KBEDR - ABARBD | Confirmation: Degree of processing | |
128 | Table/Structure Field | KBEDR - ARBEH | Unit for work | |
129 | Table/Structure Field | KBEDR - ARBEI | Work involved in the activity | |
130 | Table/Structure Field | KBEDR - ARBPL | Work center | |
131 | Table/Structure Field | KBEDR - DAUNE | Normal duration/unit | |
132 | Table/Structure Field | KBEDR - DAUNO | Normal duration of the activity | |
133 | Table/Structure Field | KBEDR - FENDD | Earliest finish /date | |
134 | Table/Structure Field | KBEDR - FRUEHER | Actual start is before earliest scheduled start | |
135 | Table/Structure Field | KBEDR - FSTAD | Earliest start / date | |
136 | Table/Structure Field | KBEDR - IDAUE | Unit for actual duration | |
137 | Table/Structure Field | KBEDR - IDAUR | Actual duration for confirmation | |
138 | Table/Structure Field | KBEDR - IENDD | Actual finish / date | |
139 | Table/Structure Field | KBEDR - ISMNW | Actual work | |
140 | Table/Structure Field | KBEDR - ISTAD | Actual start / date | |
141 | Table/Structure Field | KBEDR - KAPAR | Capacity category | |
142 | Table/Structure Field | KBEDR - KAPTXT | Capacity short text | |
143 | Table/Structure Field | KBEDR - ODAUE | Unit for remaining duration | |
144 | Table/Structure Field | KBEDR - ODAUR | Remaining duration of activity | |
145 | Table/Structure Field | KBEDR - OFMNW | Forecasted work (actual + remaining) | |
146 | Table/Structure Field | KBEDR - PDAE | Unit of the forecasted duration from the confirmation | |
147 | Table/Structure Field | KBEDR - PDAU | Forecasted duration of activity from confirmation | |
148 | Table/Structure Field | KBEDR - PENDD | Forecast finish / date | |
149 | Table/Structure Field | KBEDR - PERNR | Personnel Number | |
150 | Table/Structure Field | KBEDR - PLNUM | Planned order number | |
151 | Table/Structure Field | KBEDR - REMNE | Unit for work | |
152 | Table/Structure Field | KBEDR - REMNW | Remaining work | |
153 | Table/Structure Field | KBEDR - SENDD | Latest finish / date | |
154 | Table/Structure Field | KBEDR - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | |
155 | Table/Structure Field | KBEDR - SPLIT | Split number | |
156 | Table/Structure Field | KBEDR - SSTAD | Latest start / date | |
157 | Table/Structure Field | KBEDR - USE04 | User field: Unit for quantity fields | |
158 | Table/Structure Field | KBEDR - USE05 | User field: Unit for quantity fields | |
159 | Table/Structure Field | KBEDR - USR04 | User field for quantity (length 10.3) | |
160 | Table/Structure Field | KBEDR - USR05 | User field for quantity (length 10.3) | |
161 | Table/Structure Field | KBEDR - VEINH | Unit for Duration of the Delay | |
162 | Table/Structure Field | KBEDR - VERZUG | Duration After Latest Scheduled Finish | |
163 | Table/Structure Field | KBEDR - VORBEI | Duration After Earliest Scheduled Start | |
164 | Table/Structure Field | KBEDR - WERKS | Plant | |
165 | Table/Structure Field | KKHIE - STUFE | CO-PC Hierarchy Level | |
166 | Table/Structure Field | KKRVDCOOBJ - OBJNR | Object number | |
167 | Table/Structure Field | KKRVDCOOBJ - VARHIEBG | Variable hierarchy code (CO object summarization) | |
168 | Table/Structure Field | MLSTR - EDATU | Fixed milestone date (basic) | |
169 | Table/Structure Field | MLSTR - KTEXT | Description | |
170 | Table/Structure Field | MLSTR - LST_ACTDT | Actual date (Milestone met) | |
171 | Table/Structure Field | MLSTR - LTXSP | Language: The long text was stored in this language | |
172 | Table/Structure Field | MLSTR - MLST_ZAEHL | Number of milestone | |
173 | Table/Structure Field | MLSTR - PDATU | Fixed milestone date (F) | |
174 | Table/Structure Field | MLSTR - TEDAT | Scheduled milestone date (Basic) | |
175 | Table/Structure Field | MLSTR - TPDAT | Scheduled milestone date (Forecast) | |
176 | Table/Structure Field | NETZR - APRIO | Order priority | |
177 | Table/Structure Field | NETZR - AUFNR | Network number | |
178 | Table/Structure Field | NETZR - DISPO | MRP controller for the order | |
179 | Table/Structure Field | NETZR - DSNAM | Name of MRP controller | |
180 | Table/Structure Field | NETZR - GETRI | Confirmed Order Finish Date | |
181 | Table/Structure Field | NETZR - GLTPP | Finish date (forecast) | |
182 | Table/Structure Field | NETZR - GLTPS | Scheduled forecast finish | |
183 | Table/Structure Field | NETZR - GLTRP | Basic finish date | |
184 | Table/Structure Field | NETZR - GLTRS | Scheduled finish | |
185 | Table/Structure Field | NETZR - GSTPP | Forecast start date | |
186 | Table/Structure Field | NETZR - GSTPS | Scheduled forecast start | |
187 | Table/Structure Field | NETZR - GSTRI | Actual start date | |
188 | Table/Structure Field | NETZR - GSTRP | Basic start date | |
189 | Table/Structure Field | NETZR - GSTRS | Scheduled start | |
190 | Table/Structure Field | NETZR - KTEXT | Description | |
191 | Table/Structure Field | NETZR - LTEXT | Long Text Exists | |
192 | Table/Structure Field | PLAF - PLNUM | Planned order number | |
193 | Table/Structure Field | PLAFR - MTEXT | Material description | |
194 | Table/Structure Field | PLAFR - PEDTR | Order finish date in the planned order | |
195 | Table/Structure Field | PLAFR - PLNUM | Planned order number | |
196 | Table/Structure Field | PLAFR - PLWRK | Planning Plant | |
197 | Table/Structure Field | PLAFR - PSTTR | Order start date in planned order | |
198 | Table/Structure Field | PLAFR - PWWRK | Production plant in planned order | |
199 | Table/Structure Field | PROJR - KALID | Factory calendar key | |
200 | Table/Structure Field | PROJR - PLFAZ | Project planned start date | |
201 | Table/Structure Field | PROJR - PLSEZ | Project planned finish date | |
202 | Table/Structure Field | PROJR - POST1 | PS: Short description (first text line) | |
203 | Table/Structure Field | PROJR - PSPID | Project definition | |
204 | Table/Structure Field | PROJR - PWHIE | WBS currency (project definition) | |
205 | Table/Structure Field | PROJR - VBUKR | Company code for the project | |
206 | Table/Structure Field | PROJR - VGSBR | Business area for the project | |
207 | Table/Structure Field | PROJR - VKOKR | Controlling area for the project | |
208 | Table/Structure Field | PRPSR - EDAUR | Duration | |
209 | Table/Structure Field | PRPSR - EEINH | Unit for the length (duration) of the WBS element | |
210 | Table/Structure Field | PRPSR - EENDE | Forecasted finish date of the WBS element | |
211 | Table/Structure Field | PRPSR - EETRM | Scheduled finish date (Forecast) | |
212 | Table/Structure Field | PRPSR - ESTRM | Scheduled start date (Forecast) | |
213 | Table/Structure Field | PRPSR - ESTRT | Forecasted start date of the WBS element | |
214 | Table/Structure Field | PRPSR - EVGEW | Aggregation weight for POC (PS progress) | |
215 | Table/Structure Field | PRPSR - FABKL | Calendar for the dates in the WBS element | |
216 | Table/Structure Field | PRPSR - IDAUR | Actual duration | |
217 | Table/Structure Field | PRPSR - IEINH | Unit for the length (duration) of the WBS element | |
218 | Table/Structure Field | PRPSR - IENDE | Actual finish date of the WBS element | |
219 | Table/Structure Field | PRPSR - ISTRT | Actual start date for the WBS element | |
220 | Table/Structure Field | PRPSR - PBUKR | Company code for WBS element | |
221 | Table/Structure Field | PRPSR - PDAUR | Forecast duration | |
222 | Table/Structure Field | PRPSR - PEINH | Unit for the length (duration) of the WBS element | |
223 | Table/Structure Field | PRPSR - PENDE | WBS element: Basic finish date | |
224 | Table/Structure Field | PRPSR - PGSBR | Business area for WBS element | |
225 | Table/Structure Field | PRPSR - PKOKR | Controlling area for WBS element | |
226 | Table/Structure Field | PRPSR - POSID | Work Breakdown Structure Element (WBS Element) | |
227 | Table/Structure Field | PRPSR - POST1 | PS: Short description (first text line) | |
228 | Table/Structure Field | PRPSR - PSTRM | Scheduled start (Basic) | |
229 | Table/Structure Field | PRPSR - PSTRT | WBS element: Basic start date | |
230 | Table/Structure Field | PRPSR - PWPOS | WBS element currency | |
231 | Table/Structure Field | PRPSR - STUFE | Level in project hierarchy | |
232 | Table/Structure Field | PRPSR - VIEND | Tentative actual finish date for WBS element | |
233 | Table/Structure Field | PRPSR - VISTR | Tentative actual start date for WBS element | |
234 | Table/Structure Field | PRTE - EETRF | Earliest scheduled finish date (forecast) | |
235 | Table/Structure Field | PRTE - ESTRS | Latest scheduled start date (forecast) | |
236 | Table/Structure Field | PRTE - PETRF | Earliest scheduled finish date (basic) | |
237 | Table/Structure Field | PRTE - PETRM | Scheduled finish (Basic) | |
238 | Table/Structure Field | PRTE - PSTRS | Latest scheduled start date (basic) | |
239 | Table/Structure Field | PRTEINC - EETRF | PRTEINC-EETRF | |
240 | Table/Structure Field | PRTEINC - ESTRS | PRTEINC-ESTRS | |
241 | Table/Structure Field | PRTEINC - PETRF | PRTEINC-PETRF | |
242 | Table/Structure Field | PRTEINC - PETRM | Scheduled finish (Basic) | |
243 | Table/Structure Field | PRTEINC - PSTRS | PRTEINC-PSTRS | |
244 | Table/Structure Field | PSTXR - TXTAR | Text type | |
245 | Table/Structure Field | PSTXR - TXTTI | PS text description | |
246 | Table/Structure Field | RCRKK - KALID | Factory Calendar | |
247 | Table/Structure Field | RESBR - APOSN | BOM item number | |
248 | Table/Structure Field | RESBR - AUFNR | Order/Network number | |
249 | Table/Structure Field | RESBR - BANFNR | Purchase requisition number | |
250 | Table/Structure Field | RESBR - BANFPO | Item number of purchase requisition | |
251 | Table/Structure Field | RESBR - BDTER | Requirements date for the component | |
252 | Table/Structure Field | RESBR - KZBWS | Valuation of Special Stock | |
253 | Table/Structure Field | RESBR - MATNR | Material Number | |
254 | Table/Structure Field | RESBR - MTEXT | Material description | |
255 | Table/Structure Field | RESBR - PLNUM | Planned order number | |
256 | Table/Structure Field | RESBR - POSTP | Item category (bill of material) | |
257 | Table/Structure Field | RESBR - POTX1 | BOM Item Text (Line 1) | |
258 | Table/Structure Field | RESBR - RSNUM | Number of reservation/dependent requirements | |
259 | Table/Structure Field | RESBR - RSPOS | Item Number of Reservation / Dependent Requirements | |
260 | Table/Structure Field | RESBR - VORNR | Activity number in network and standard network | |
261 | Table/Structure Field | RSTHIE - ID | Internal: Node ID | |
262 | Table/Structure Field | RSTHIE - NAME | Name of a Hierarchy Object | |
263 | Table/Structure Field | RSTHIE - TLEVEL | Node level | |
264 | Table/Structure Field | RSTHIE - TYPE | Node type | |
265 | Table/Structure Field | STRUCR - ABARBA | Percent of completion for work | |
266 | Table/Structure Field | STRUCR - ABARBD | Processing % of duration | |
267 | Table/Structure Field | STRUCR - BUKRS | Company Code | |
268 | Table/Structure Field | STRUCR - DATFS | Earliest start date | |
269 | Table/Structure Field | STRUCR - DATSE | Latest finish date | |
270 | Table/Structure Field | STRUCR - EARBEH | Unit for work | |
271 | Table/Structure Field | STRUCR - EARBEI | Work | |
272 | Table/Structure Field | STRUCR - ECKEN | Finish date (from basic dates) | |
273 | Table/Structure Field | STRUCR - ECKST | Basic start date | |
274 | Table/Structure Field | STRUCR - EDAUEH | Actual duration unit | |
275 | Table/Structure Field | STRUCR - EDAUER | Duration | |
276 | Table/Structure Field | STRUCR - EVGEW | Aggregation weight for POC (PS progress) | |
277 | Table/Structure Field | STRUCR - FRUEHER | Actual start is before earliest scheduled start | |
278 | Table/Structure Field | STRUCR - GSBER | Business Area | |
279 | Table/Structure Field | STRUCR - IARBEH | Unit for work | |
280 | Table/Structure Field | STRUCR - IARBEI | Actual work | |
281 | Table/Structure Field | STRUCR - IDAUEH | Actual duration unit | |
282 | Table/Structure Field | STRUCR - IDAUER | Actual duration | |
283 | Table/Structure Field | STRUCR - ISTEN | Actual finish date | |
284 | Table/Structure Field | STRUCR - ISTST | Actual start date | |
285 | Table/Structure Field | STRUCR - KALID | Factory Calendar | |
286 | Table/Structure Field | STRUCR - KOKRS | Controlling Area | |
287 | Table/Structure Field | STRUCR - KURZTEXT | Short text/description of the object | |
288 | Table/Structure Field | STRUCR - OBJEKTID | ID/Object key | |
289 | Table/Structure Field | STRUCR - OBJEKTTYP | Object Type Text | |
290 | Table/Structure Field | STRUCR - PARBEH | Unit for work | |
291 | Table/Structure Field | STRUCR - PARBEI | Forecast work | |
292 | Table/Structure Field | STRUCR - PDAUEH | Actual duration unit | |
293 | Table/Structure Field | STRUCR - PDAUER | Forecast duration | |
294 | Table/Structure Field | STRUCR - PROGEN | Forecast finish date | |
295 | Table/Structure Field | STRUCR - PROGST | Forecast start date | |
296 | Table/Structure Field | STRUCR - PSPRI | Priority | |
297 | Table/Structure Field | STRUCR - RARBEH | Unit for work | |
298 | Table/Structure Field | STRUCR - RARBEI | Remaining work | |
299 | Table/Structure Field | STRUCR - RDAUEH | Actual duration unit | |
300 | Table/Structure Field | STRUCR - RDAUER | Remaining duration | |
301 | Table/Structure Field | STRUCR - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | |
302 | Table/Structure Field | STRUCR - STATXT | Edited status text | |
303 | Table/Structure Field | STRUCR - TEENFR | Earliest scheduled finish (from basic dates) | |
304 | Table/Structure Field | STRUCR - TEENSP | Latest scheduled finish (from basic dates) | |
305 | Table/Structure Field | STRUCR - TESTFR | Earliest scheduled start (from basic dates) | |
306 | Table/Structure Field | STRUCR - TESTSP | Latest scheduled start (from basic dates) | |
307 | Table/Structure Field | STRUCR - TPENFR | Earliest scheduled finish (from forecast dates) | |
308 | Table/Structure Field | STRUCR - TPENSP | Latest scheduled finish (from forecast dates) | |
309 | Table/Structure Field | STRUCR - TPSTFR | Earliest scheduled start (from forecast dates) | |
310 | Table/Structure Field | STRUCR - TPSTSP | Latest scheduled start (from forecast dates) | |
311 | Table/Structure Field | STRUCR - TXTSP | Language: The long text was stored in this language | |
312 | Table/Structure Field | STRUCR - USE04 | User field: Unit for quantity fields | |
313 | Table/Structure Field | STRUCR - USE05 | User field: Unit for quantity fields | |
314 | Table/Structure Field | STRUCR - USR04 | User field for quantity (length 10.3) | |
315 | Table/Structure Field | STRUCR - USR05 | User field for quantity (length 10.3) | |
316 | Table/Structure Field | STRUCR - VARBEH | Unit for work | |
317 | Table/Structure Field | STRUCR - VARBEI | Tentative work | |
318 | Table/Structure Field | STRUCR - VDAUEH | Actual duration unit | |
319 | Table/Structure Field | STRUCR - VDAUER | Tentative duration | |
320 | Table/Structure Field | STRUCR - VEINH | Unit for Duration of the Delay | |
321 | Table/Structure Field | STRUCR - VERNA | Name of responsible person (Project manager) | |
322 | Table/Structure Field | STRUCR - VERNR | Number of responsible person (project mgr)/MRP controller | |
323 | Table/Structure Field | STRUCR - VERZUG | Duration After Latest Scheduled Finish | |
324 | Table/Structure Field | STRUCR - VORBEI | Duration After Earliest Scheduled Start | |
325 | Table/Structure Field | STRUCR - VORLEN | Tentative finish date | |
326 | Table/Structure Field | STRUCR - VORLST | Tentative start date | |
327 | Table/Structure Field | STRUCR - WAERS | Currency Key | |
328 | Table/Structure Field | STRUCR - WERKS | Plant | |
329 | Table/Structure Field | STRUCR_AFTER_RPSCO - EVGEW | Aggregation weight for POC (PS progress) | |
330 | Table/Structure Field | STRUCR_BEFORE_DATES - KURZTEXT | Short text/description of the object | |
331 | Table/Structure Field | STRUCR_BEFORE_DATES - OBJEKTID | ID/Object key | |
332 | Table/Structure Field | STRUCR_BEFORE_DATES - OBJEKTTYP | Object Type Text | |
333 | Table/Structure Field | STRUCR_BEFORE_RPSCO - BUKRS | Company Code | |
334 | Table/Structure Field | STRUCR_BEFORE_RPSCO - FRUEHER | Actual start is before earliest scheduled start | |
335 | Table/Structure Field | STRUCR_BEFORE_RPSCO - GSBER | Business Area | |
336 | Table/Structure Field | STRUCR_BEFORE_RPSCO - KALID | Factory Calendar | |
337 | Table/Structure Field | STRUCR_BEFORE_RPSCO - KOKRS | Controlling Area | |
338 | Table/Structure Field | STRUCR_BEFORE_RPSCO - PSPRI | Priority | |
339 | Table/Structure Field | STRUCR_BEFORE_RPSCO - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | |
340 | Table/Structure Field | STRUCR_BEFORE_RPSCO - STATXT | Edited status text | |
341 | Table/Structure Field | STRUCR_BEFORE_RPSCO - TXTSP | Language: The long text was stored in this language | |
342 | Table/Structure Field | STRUCR_BEFORE_RPSCO - VEINH | Unit for Duration of the Delay | |
343 | Table/Structure Field | STRUCR_BEFORE_RPSCO - VERNA | Name of responsible person (Project manager) | |
344 | Table/Structure Field | STRUCR_BEFORE_RPSCO - VERNR | Number of responsible person (project mgr)/MRP controller | |
345 | Table/Structure Field | STRUCR_BEFORE_RPSCO - VERZUG | Duration After Latest Scheduled Finish | |
346 | Table/Structure Field | STRUCR_BEFORE_RPSCO - VORBEI | Duration After Earliest Scheduled Start | |
347 | Table/Structure Field | STRUCR_BEFORE_RPSCO - WAERS | Currency Key | |
348 | Table/Structure Field | STRUCR_BEFORE_RPSCO - WERKS | Plant | |
349 | Table/Structure Field | STRUCR_BEFORE_USER - ABARBA | Percent of completion for work | |
350 | Table/Structure Field | STRUCR_BEFORE_WORK - ABARBD | Processing % of duration | |
351 | Table/Structure Field | STRUCR_BEFORE_WORK - EDAUEH | Actual duration unit | |
352 | Table/Structure Field | STRUCR_BEFORE_WORK - EDAUER | Duration | |
353 | Table/Structure Field | STRUCR_BEFORE_WORK - IDAUEH | Actual duration unit | |
354 | Table/Structure Field | STRUCR_BEFORE_WORK - IDAUER | Actual duration | |
355 | Table/Structure Field | STRUCR_BEFORE_WORK - PDAUEH | Actual duration unit | |
356 | Table/Structure Field | STRUCR_BEFORE_WORK - PDAUER | Forecast duration | |
357 | Table/Structure Field | STRUCR_BEFORE_WORK - RDAUEH | Actual duration unit | |
358 | Table/Structure Field | STRUCR_BEFORE_WORK - RDAUER | Remaining duration | |
359 | Table/Structure Field | STRUCR_BEFORE_WORK - VDAUEH | Actual duration unit | |
360 | Table/Structure Field | STRUCR_BEFORE_WORK - VDAUER | Tentative duration | |
361 | Table/Structure Field | STRUCR_DATES - DATFS | Earliest start date | |
362 | Table/Structure Field | STRUCR_DATES - DATSE | Latest finish date | |
363 | Table/Structure Field | STRUCR_DATES - ECKEN | Finish date (from basic dates) | |
364 | Table/Structure Field | STRUCR_DATES - ECKST | Basic start date | |
365 | Table/Structure Field | STRUCR_DATES - ISTEN | Actual finish date | |
366 | Table/Structure Field | STRUCR_DATES - ISTST | Actual start date | |
367 | Table/Structure Field | STRUCR_DATES - PROGEN | Forecast finish date | |
368 | Table/Structure Field | STRUCR_DATES - PROGST | Forecast start date | |
369 | Table/Structure Field | STRUCR_DATES - TEENFR | Earliest scheduled finish (from basic dates) | |
370 | Table/Structure Field | STRUCR_DATES - TEENSP | Latest scheduled finish (from basic dates) | |
371 | Table/Structure Field | STRUCR_DATES - TESTFR | Earliest scheduled start (from basic dates) | |
372 | Table/Structure Field | STRUCR_DATES - TESTSP | Latest scheduled start (from basic dates) | |
373 | Table/Structure Field | STRUCR_DATES - TPENFR | Earliest scheduled finish (from forecast dates) | |
374 | Table/Structure Field | STRUCR_DATES - TPENSP | Latest scheduled finish (from forecast dates) | |
375 | Table/Structure Field | STRUCR_DATES - TPSTFR | Earliest scheduled start (from forecast dates) | |
376 | Table/Structure Field | STRUCR_DATES - TPSTSP | Latest scheduled start (from forecast dates) | |
377 | Table/Structure Field | STRUCR_DATES - VORLEN | Tentative finish date | |
378 | Table/Structure Field | STRUCR_DATES - VORLST | Tentative start date | |
379 | Table/Structure Field | STRUCR_USER - USE04 | User field: Unit for quantity fields | |
380 | Table/Structure Field | STRUCR_USER - USE05 | User field: Unit for quantity fields | |
381 | Table/Structure Field | STRUCR_USER - USR04 | User field for quantity (length 10.3) | |
382 | Table/Structure Field | STRUCR_USER - USR05 | User field for quantity (length 10.3) | |
383 | Table/Structure Field | STRUCR_WORK - EARBEH | Unit for work | |
384 | Table/Structure Field | STRUCR_WORK - EARBEI | Work | |
385 | Table/Structure Field | STRUCR_WORK - IARBEH | Unit for work | |
386 | Table/Structure Field | STRUCR_WORK - IARBEI | Actual work | |
387 | Table/Structure Field | STRUCR_WORK - PARBEH | Unit for work | |
388 | Table/Structure Field | STRUCR_WORK - PARBEI | Forecast work | |
389 | Table/Structure Field | STRUCR_WORK - RARBEH | Unit for work | |
390 | Table/Structure Field | STRUCR_WORK - RARBEI | Remaining work | |
391 | Table/Structure Field | STRUCR_WORK - VARBEH | Unit for work | |
392 | Table/Structure Field | STRUCR_WORK - VARBEI | Tentative work | |
393 | Table/Structure Field | SYST - FDPOS | ABAP System Field: Occurrence in Byte or Character String | |
394 | Table/Structure Field | SYST - INDEX | ABAP System Field: Loop Index | |
395 | Table/Structure Field | SYST - LANGU | ABAP System Field: Language Key of Text Environment | |
396 | Table/Structure Field | SYST - MANDT | ABAP System Field: Client ID of Current User | |
397 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
398 | Table/Structure Field | SYST - TFILL | ABAP System Field: Number of Rows in Internal Tables | |
399 | Table/Structure Field | SYST - UZEIT | ABAP System Field: Current Time of Application Server | |
400 | Table/Structure Field | T001W - FABKL | Factory calendar key | |
401 | Table/Structure Field | T006 - MSEHI | Unit of Measurement | |
402 | Table/Structure Field | TCN04 - SPRAS | Language Key | |
403 | Table/Structure Field | TCN04 - TXT08 | Description for PS text type (8 characters) | |
404 | Table/Structure Field | TCN04 - TXTAR | Text type | |
405 | Table/Structure Field | TCNDS - HIERAR | Hierarchy Type | |
406 | Table/Structure Field | TCNDS - HIERID | Hierarchy ID | |
407 | Table/Structure Field | TKKR1 - FLENGTH | Length of Hierarchy Field | |
408 | Table/Structure Field | TKKR1 - HIART | Hierarchy Type | |
409 | Table/Structure Field | TKKR1 - IDENT | Hierarchy ID | |
410 | Table/Structure Field | TKKR1 - OFFSET | Offset of Hierarchy Field | |
411 | Table/Structure Field | TKKR1 - STUFE | Number of Hierarchy Level | |
412 | Table/Structure Field | VBAK - OBJNR | Object number at header level | |
413 | Table/Structure Field | VBAKR - BUKRS_VF | Company code to be billed | |
414 | Table/Structure Field | VBAKR - GUEBG | Valid-from date (outline agreements, product proposals) | |
415 | Table/Structure Field | VBAKR - GUEEN | Valid-to date (outline agreements, product proposals) | |
416 | Table/Structure Field | VBAKR - KDAUF | Sales Document | |
417 | Table/Structure Field | VBAKR - KTEXT | Search term for product proposal | |
418 | Table/Structure Field | VBAPR - ARKTX | Short text for sales order item | |
419 | Table/Structure Field | VBAPR - KDAUF | Sales Document | |
420 | Table/Structure Field | VBAPR - KDPOS | Sales Document Item |