Table/Structure Field list used by SAP ABAP Program LCP13F01 (Copy Task List)
SAP ABAP Program LCP13F01 (Copy Task List) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | DNTAB - FIELDNAME | Field Name | |
2 | Table/Structure Field | EMARA - CUOBF | Internal object number | |
3 | Table/Structure Field | EMARA - KZEFF | Assign effectivity parameter values/ override change numbers | |
4 | Table/Structure Field | EMARA - KZKFG | Configurable Material | |
5 | Table/Structure Field | EMARA - MEINS | Base Unit of Measure | |
6 | Table/Structure Field | EMARA - MSTAE | Cross-Plant Material Status | |
7 | Table/Structure Field | EMARA - MTART | Material type | |
8 | Table/Structure Field | EMARA - SATNR | Cross-Plant Configurable Material | |
9 | Table/Structure Field | EMARC - BESKZ | Procurement Type | |
10 | Table/Structure Field | EMARC - FEVOR | Production Supervisor | |
11 | Table/Structure Field | EMARC - MMSTA | Plant-Specific Material Status | |
12 | Table/Structure Field | EMARC1 - BESKZ | Procurement Type | |
13 | Table/Structure Field | EMARC1 - FEVOR | Production Supervisor | |
14 | Table/Structure Field | EMARC1 - MMSTA | Plant-Specific Material Status | |
15 | Table/Structure Field | INOB - CUOBJ | Configuration (internal object number) | |
16 | Table/Structure Field | MARA - CUOBF | Internal object number | |
17 | Table/Structure Field | MARA - KZEFF | Assign effectivity parameter values/ override change numbers | |
18 | Table/Structure Field | MARA - KZKFG | Configurable Material | |
19 | Table/Structure Field | MARA - MATNR | Material Number | |
20 | Table/Structure Field | MARA - MEINS | Base Unit of Measure | |
21 | Table/Structure Field | MARA - MSTAE | Cross-Plant Material Status | |
22 | Table/Structure Field | MARA - MTART | Material type | |
23 | Table/Structure Field | MARA - SATNR | Cross-Plant Configurable Material | |
24 | Table/Structure Field | MARC - BESKZ | Procurement Type | |
25 | Table/Structure Field | MARC - FEVOR | Production Supervisor | |
26 | Table/Structure Field | MARC - MATNR | Material Number | |
27 | Table/Structure Field | MARC - MMSTA | Plant-Specific Material Status | |
28 | Table/Structure Field | MARC - WERKS | Plant | |
29 | Table/Structure Field | PLFL - AEDAT | Last Changed On | |
30 | Table/Structure Field | PLFL - ANDAT | Date Record Created on | |
31 | Table/Structure Field | PLFL - PLNAL | Group Counter | |
32 | Table/Structure Field | PLFL - PLNFL | Sequence | |
33 | Table/Structure Field | PLFLD - AEDAT | Last Changed On | |
34 | Table/Structure Field | PLFLD - ANDAT | Date Record Created on | |
35 | Table/Structure Field | PLKO - FLG_CAPO | Recalculate standard values at order creation using CAPP | |
36 | Table/Structure Field | PLKO - LOSVN | From Lot Size | |
37 | Table/Structure Field | PLKO - PLNAL | Group Counter | |
38 | Table/Structure Field | PLKO - PLNNR | Key for Task List Group | |
39 | Table/Structure Field | PLKO - PLNTY | Task List Type | |
40 | Table/Structure Field | PLKO - VAGRP | Responsible planner group/department | |
41 | Table/Structure Field | PLKOD - LOSVN | From Lot Size | |
42 | Table/Structure Field | PLPO - AEDAT | Last Changed On | |
43 | Table/Structure Field | PLPO - ANDAT | Date Record Created on | |
44 | Table/Structure Field | PLPO - PLNNR | Key for Task List Group | |
45 | Table/Structure Field | PLPO - PLNTY | Task List Type | |
46 | Table/Structure Field | PLPO - VORNR | Operation/Activity Number | |
47 | Table/Structure Field | PLPOD - AEDAT | Last Changed On | |
48 | Table/Structure Field | PLPOD - ANDAT | Date Record Created on | |
49 | Table/Structure Field | PLSR - AUSSS | Assembly scrap in percent | |
50 | Table/Structure Field | PLSR - BEARZ | Processing time | |
51 | Table/Structure Field | PLSR - LOSGR | Base quantity | |
52 | Table/Structure Field | PLSR - MANDT | Client | |
53 | Table/Structure Field | PLSR - MATNR | Material Number | |
54 | Table/Structure Field | PLSR - PLNAL | Group Counter | |
55 | Table/Structure Field | PLSR - PLNME | Task list unit of measure | |
56 | Table/Structure Field | PLSR - PLNNR | Key for Task List Group | |
57 | Table/Structure Field | PLSR - PLNTY | Task List Type | |
58 | Table/Structure Field | PLSR - RUEZT | Setup and teardown time | |
59 | Table/Structure Field | PLSR - TERMKZ | Scheduling type | |
60 | Table/Structure Field | PLSR - TERM_DATE | Date for which results were determined | |
61 | Table/Structure Field | PLSR - TERM_USER | Person who carried out scheduling | |
62 | Table/Structure Field | PLSR - TRANZ | Interoperation time | |
63 | Table/Structure Field | PLSR - WERKS | Plant | |
64 | Table/Structure Field | RC27D - AKHOR | Date for task list selection | |
65 | Table/Structure Field | RC27D - FEVOR | Production Supervisor | |
66 | Table/Structure Field | RC27D - FLG_AUSSS | Ind.: material master update with assembly scrap | |
67 | Table/Structure Field | RC27D - FLG_CAP | Carry out CAPP Calculation | |
68 | Table/Structure Field | RC27D - FLG_MAT | Ind: Update material master directly | |
69 | Table/Structure Field | RC27D - FLG_SAVE | Ind: Save scheduling results without user prompting | |
70 | Table/Structure Field | RC27D - MATNR_B | Material Number | |
71 | Table/Structure Field | RC27D - MATNR_V | Material Number | |
72 | Table/Structure Field | RC27D - PLNAL | Group Counter | |
73 | Table/Structure Field | RC27D - PLNNR | Key for Task List Group | |
74 | Table/Structure Field | RC27D - PLNTY | Task List Type | |
75 | Table/Structure Field | RC27D - STATU | Status | |
76 | Table/Structure Field | RC27D - STTAG | Key date for task list selection and scheduling start date | |
77 | Table/Structure Field | RC27D - VAGRP | Responsible planner group/department | |
78 | Table/Structure Field | RC27D - VERWE | Task list usage | |
79 | Table/Structure Field | RC27D - WERKS_M | Plant | |
80 | Table/Structure Field | RC27D - WERKS_P | Plant | |
81 | Table/Structure Field | RC27M - AUSSS | Assembly scrap in percent | |
82 | Table/Structure Field | RC27M - BASMG | Base quantity | |
83 | Table/Structure Field | RC27M - BEARZ | Processing time | |
84 | Table/Structure Field | RC27M - CUOBF | Internal object number | |
85 | Table/Structure Field | RC27M - CUOBJ | Configurable material | |
86 | Table/Structure Field | RC27M - FEVOR | Production Supervisor | |
87 | Table/Structure Field | RC27M - FHORI | Scheduling Margin Key for Floats | |
88 | Table/Structure Field | RC27M - MATNR | Material Number | |
89 | Table/Structure Field | RC27M - MEINS | Base Unit of Measure | |
90 | Table/Structure Field | RC27M - RUEZT | Setup and teardown time | |
91 | Table/Structure Field | RC27M - SATNR | Cross-Plant Configurable Material | |
92 | Table/Structure Field | RC27M - STDPD | Configurable material | |
93 | Table/Structure Field | RC27M - TRANZ | Interoperation time | |
94 | Table/Structure Field | RC27M - WERKS | Plant | |
95 | Table/Structure Field | RC27S - BLDGR | Screen group | |
96 | Table/Structure Field | RCLST - INDEX_PLFL | Index referring to record table for sequences | |
97 | Table/Structure Field | RCLST - INDEX_PLPO | Index referring to record table for items | |
98 | Table/Structure Field | RCLST - OBJECT | Data objects of a task list | |
99 | Table/Structure Field | RCPSE - FLG_SEL_AU | Indicator: Automatic selection of task list | |
100 | Table/Structure Field | RCPSE - LOSGR | Planned lot size | |
101 | Table/Structure Field | RCPSE - MATNR | Material Number | |
102 | Table/Structure Field | RCPSE - OBJECT | Selection object for the selection of task lists | |
103 | Table/Structure Field | RCPSE - PLNAL | Group Counter | |
104 | Table/Structure Field | RCPSE - PLNNR | Key for Task List Group | |
105 | Table/Structure Field | RCPSE - PLNTY | Task List Type | |
106 | Table/Structure Field | RCPSE - POSGR | Group of doc.items for screen sequence | |
107 | Table/Structure Field | RCPSE - SEL_ID | Selection ID for the selection of task lists | |
108 | Table/Structure Field | RCPSE - STATU | Status | |
109 | Table/Structure Field | RCPSE - STTAG | Key date | |
110 | Table/Structure Field | RCPSE - VAGRP | Responsible planner group/department | |
111 | Table/Structure Field | RCPSE - VERWE1 | Use by user or system | |
112 | Table/Structure Field | RCPSE - WERKS_ALT | Plant of the task list | |
113 | Table/Structure Field | RCPSE - WERKS_MAT | Plant of the material | |
114 | Table/Structure Field | RCPTE - AUSSS | Assembly scrap in percent | |
115 | Table/Structure Field | RCPTE - BASMG | Quantity used for scheduling | |
116 | Table/Structure Field | RCPTE - BEARZ | Processing time | |
117 | Table/Structure Field | RCPTE - MATNR | Material Number | |
118 | Table/Structure Field | RCPTE - MEINS | Unit of measure for the quantity used in scheduling | |
119 | Table/Structure Field | RCPTE - RUEZT | Setup and teardown time | |
120 | Table/Structure Field | RCPTE - TRANZ | Interoperation time | |
121 | Table/Structure Field | RCPTE - WERKS | Plant | |
122 | Table/Structure Field | RCPTM - LOSGR | Lot size | |
123 | Table/Structure Field | RCPTM - LOSME | Unit of the lot size used in scheduling | |
124 | Table/Structure Field | RCPTM - PLNAL | Group Counter | |
125 | Table/Structure Field | RCPTM - PLNNR | Key for Task List Group | |
126 | Table/Structure Field | RCPTM - PLNTY | Task List Type | |
127 | Table/Structure Field | RCPTM - START | Start date for scheduling | |
128 | Table/Structure Field | RCPTM - TERMKZ | Scheduling type | |
129 | Table/Structure Field | SYST - DATUM | ABAP System Field: Current Date of Application Server | |
130 | Table/Structure Field | SYST - MANDT | ABAP System Field: Client ID of Current User | |
131 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
132 | Table/Structure Field | SYST - UNAME | ABAP System Field: Name of Current User | |
133 | Table/Structure Field | SYST - VLINE | ABAP System Field: Vertical Line for List | |
134 | Table/Structure Field | T141 - DAPLA | Message if material is used in routing/master recipe | |
135 | Table/Structure Field | T482 - TERMKZ | Scheduling type | |
136 | Table/Structure Field | T482 - VORWT | Forward scheduling | |
137 | Table/Structure Field | TC01 - CUASTATUS | GUI status | |
138 | Table/Structure Field | TC01 - TITEL | GUI title number | |
139 | Table/Structure Field | TCA01 - PLNAW | Application of the task list | |
140 | Table/Structure Field | TCA11 - FLG_ALT | Indicator: headers | |
141 | Table/Structure Field | TCA11 - FLG_AOB | Key: View of relationships | |
142 | Table/Structure Field | TCA11 - FLG_OPR | Indicator: operations | |
143 | Table/Structure Field | TCA11 - FLG_SEQ | Sequences | |
144 | Table/Structure Field | TCA43 - SEL_ID | Selection ID for the selection of task lists | |
145 | Table/Structure Field | TCA72 - CHECK_NR | Inspection level | |
146 | Table/Structure Field | TCX00 - APLS1 | Selection ID (detailed planning) | |
147 | Table/Structure Field | TCX00 - APLS2 | Selection ID (rate-based planning) | |
148 | Table/Structure Field | TCX00 - APLS3 | Selection ID (rough-cut planning) | |
149 | Table/Structure Field | TCX00 - DADJ1 | Scheduling level for adjusting basic dates |