Table/Structure Field list used by SAP ABAP Program L0MEVI10 (User-Defined Modules for SAPL0MEV)
SAP ABAP Program L0MEVI10 (User-Defined Modules for SAPL0MEV) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | EMARC - MRPPP | PPC planning calendar | |
2 | Table/Structure Field | EMARC3 - MRPPP | PPC planning calendar | |
3 | Table/Structure Field | MARC - MRPPP | PPC planning calendar | |
4 | Table/Structure Field | RM06E - ALLANZ | Standard Product and Variants | |
5 | Table/Structure Field | RM06E - SAMANZ | Display Configurable Material | |
6 | Table/Structure Field | RM06E - VARANZ | Display Variants | |
7 | Table/Structure Field | SCXTAB_TABSTRIP - ACTIVETAB | SCXTAB_TABSTRIP-ACTIVETAB | |
8 | Table/Structure Field | SYST - DYNNR | ABAP System Field: Current Dynpro Number | |
9 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
10 | Table/Structure Field | SYST - UCOMM | ABAP System Field: PAI-Triggering Function Code | |
11 | Table/Structure Field | T161M - DRUVO | Indicator: Print Operation | |
12 | Table/Structure Field | T163D - EBTYP | Confirmation Category | |
13 | Table/Structure Field | T163D - IBTYP | Confirmation Category: Internal | |
14 | Table/Structure Field | T163G - BSTAE | Confirmation Control Key | |
15 | Table/Structure Field | T163G - EBTYP | Confirmation Category | |
16 | Table/Structure Field | T399D - WERKS | Plant | |
17 | Table/Structure Field | T399D - REFWK | Reference plant | |
18 | Table/Structure Field | T439G - MRPPP | PPC planning calendar | |
19 | Table/Structure Field | T439G - WERKS | Plant | |
20 | Table/Structure Field | TVLK - LFART | Delivery Type | |
21 | Table/Structure Field | TVLK - VBTYP | SD document category | |
22 | Table/Structure Field | V_T160V - VARANZ | Display variants | |
23 | Table/Structure Field | V_T161M - DRUAB | Update Print-Dependent Data | |
24 | Table/Structure Field | V_T161M - DRUVO | Indicator: Print Operation | |
25 | Table/Structure Field | V_T161N - KALSM | Procedure (Pricing, Output Control, Acct. Det., Costing,...) | |
26 | Table/Structure Field | V_T161N - NFIND | New Message Determination Process for Change Messages | |
27 | Table/Structure Field | V_T163D - IBTYP | Confirmation Category: Internal | |
28 | Table/Structure Field | V_T163D - LFART | Delivery Type | |
29 | Table/Structure Field | V_T163E - EBTYP | Confirmation Category | |
30 | Table/Structure Field | V_T163G - BLFDN | Sequence of Vendor Confirmations | |
31 | Table/Structure Field | V_T163G - BSTAE | Confirmation Control Key | |
32 | Table/Structure Field | V_T163L - AAGEN | Create Inbound Deliveries Automatically | |
33 | Table/Structure Field | V_T163L - BSTAE | Confirmation Control Key | |
34 | Table/Structure Field | V_T163L - PODREL | POD Control (Proof of Delivery) | |
35 | Table/Structure Field | V_T163P - LKAGG | Forecast Delivery Schedule Creation Without Aggregation | |
36 | Table/Structure Field | V_T163P - LKALA | Planning Calendar for Aggregation | |
37 | Table/Structure Field | V_T163P - LKALU | Planning calendar for periodic transmission | |
38 | Table/Structure Field | V_T163P - LKUEB | No periodic transmission of forecast delivery schedules | |
39 | Table/Structure Field | V_T163P - LMAGG | Forecast Schedule Creation with Monthly Aggregation | |
40 | Table/Structure Field | V_T163P - LOTO1 | Upper Tolerance Limit for FRC Schedules in Checking Period 1 | |
41 | Table/Structure Field | V_T163P - LOTO2 | Upper Tolerance Limit for FRC Schedules in Checking Period 2 | |
42 | Table/Structure Field | V_T163P - LOTO3 | Upper Tolerance Limit for FRC Schedules in Checking Period 3 | |
43 | Table/Structure Field | V_T163P - LPAGG | Creation of FRC Schedules with Aggreg. Acc. to Planning Cal. | |
44 | Table/Structure Field | V_T163P - LPLT1 | Length of Checking Period 1 for FRC Schedules in Workdays | |
45 | Table/Structure Field | V_T163P - LPLT2 | Length of Checking Period 2 for FRC Schedules in Workdays | |
46 | Table/Structure Field | V_T163P - LPLT3 | Length of Checking Period 3 for FRC Schedules in Workdays | |
47 | Table/Structure Field | V_T163P - LPRA1 | Type of Check for Forecast Delivery Schedules in Period 1 | |
48 | Table/Structure Field | V_T163P - LPRA2 | Type of Check for Forecast Delivery Schedules in Period 2 | |
49 | Table/Structure Field | V_T163P - LPRA3 | Type of Check for Forecast Delivery Schedules in Period 3 | |
50 | Table/Structure Field | V_T163P - LPRHO | Checking Horizon for Forecast Delivery Schedule | |
51 | Table/Structure Field | V_T163P - LPUEB | Periodic transm. of FRC schedules acc. to planning calendar | |
52 | Table/Structure Field | V_T163P - LRUEC | Backlog in FRC Delivery Schedules is Transmission-Relevant | |
53 | Table/Structure Field | V_T163P - LRUSA | FRC Delivery Schedule: Show Backlog and Imm. Requirement | |
54 | Table/Structure Field | V_T163P - LTAGG | Forecast Delivery Schedule Creation with Daily Aggregation | |
55 | Table/Structure Field | V_T163P - LUTO1 | Lower Tolerance Limit for FRC Schedules in Checking Period 1 | |
56 | Table/Structure Field | V_T163P - LUTO2 | Lower Tolerance Limit for FRC Schedules in Checking Period 2 | |
57 | Table/Structure Field | V_T163P - LUTO3 | Lower Tolerance Limit for FRC Schedules in Checking Period 3 | |
58 | Table/Structure Field | V_T163P - LWAGG | Forecast Delivery Schedule Creation with Weekly Aggregation | |
59 | Table/Structure Field | V_T163P - WERKS | Plant | |
60 | Table/Structure Field | V_T163P - FPLT3 | Length of Checking Period 3 for JIT Schedules in Workdays | |
61 | Table/Structure Field | V_T163P - FABHO | JIT deliv. schedule horizon (SA release horizon) in workdays | |
62 | Table/Structure Field | V_T163P - FAEN | Creation Strategy for JIT Delivery Schedule: Changed Only | |
63 | Table/Structure Field | V_T163P - FKAGG | JIT Delivery Schedule Creation Without Aggregation | |
64 | Table/Structure Field | V_T163P - FKALA | Planning Calendar for Aggregation | |
65 | Table/Structure Field | V_T163P - FKALU | Planning calendar for periodic transmission | |
66 | Table/Structure Field | V_T163P - FKUEB | No periodic transmission of JIT delivery schedules | |
67 | Table/Structure Field | V_T163P - FOTO1 | Upper Tolerance Limit for JIT Schedules in Checking Period 1 | |
68 | Table/Structure Field | V_T163P - FOTO2 | Upper Tolerance Limit for JIT Schedules in Checking Period 2 | |
69 | Table/Structure Field | V_T163P - FOTO3 | Upper Tolerance Limit for JIT Schedules in Checking Period 3 | |
70 | Table/Structure Field | V_T163P - FPAGG | Creation of JIT Schedules with Aggreg. Acc. to Planning Cal. | |
71 | Table/Structure Field | V_T163P - FPLT1 | Length of Checking Period 1 for JIT Schedules in Workdays | |
72 | Table/Structure Field | V_T163P - FPLT2 | Length of Checking Period 2 for JIT Schedules in Workdays | |
73 | Table/Structure Field | V_T163P - LAEN | Creation Strategy for Forecast Deliv. Schedule: Changed Only | |
74 | Table/Structure Field | V_T163P - FPRA1 | Type of Check for JIT Delivery Schedules in Period 1 | |
75 | Table/Structure Field | V_T163P - FPRA2 | Type of Check for JIT Delivery Schedules in Period 2 | |
76 | Table/Structure Field | V_T163P - FPRA3 | Type of Check for JIT Delivery Schedules in Period 3 | |
77 | Table/Structure Field | V_T163P - FPRHO | Checking Horizon for JIT Schedule | |
78 | Table/Structure Field | V_T163P - FPUEB | Periodic transm. of JIT schedules acc. to planning calendar | |
79 | Table/Structure Field | V_T163P - FRUEC | Backlog in JIT Delivery Schedules is Transmission-Relevant | |
80 | Table/Structure Field | V_T163P - FRUSA | JIT: Show Backlog and Immediate Requirement | |
81 | Table/Structure Field | V_T163P - FTAGG | JIT Delivery Schedule Creation with Daily Aggregation | |
82 | Table/Structure Field | V_T163P - FUTO1 | Lower Tolerance Limit for JIT Schedules in Checking Period 1 | |
83 | Table/Structure Field | V_T163P - FUTO2 | Lower Tolerance Limit for JIT Schedules in Checking Period 2 | |
84 | Table/Structure Field | V_T163P - FUTO3 | Lower Tolerance Limit for JIT Schedules in Checking Period 3 | |
85 | Table/Structure Field | V_T163P - LABHO | Forecast delivery schedule horizon in workdays |