SAP ABAP Data Element WKVXXXI (Variable Control Costs for Variance Calculation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element | WKVXXXI |
Short Description | Variable Control Costs for Variance Calculation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ctrl Var. |
Medium | 15 | Ctrl Costs Var. |
Long | 20 | Control Costs, Var. |
Heading | 25 | Control Costs, Variable |
Documentation
Definition
Control costs for variance calculation
When variances are calculated on the input side, the control costs are compared against the target costs.
- In Overhead Cost Controlling, the control cost equals the actual cost.
- In Cost Object Controlling, this field shows either the actual cost from which the work in process and scrap was deducted, or the cost calculated in preliminary order costing (which may be period-based). Which cost is shown depends on the target cost version.
In the first case, the control cost is calculated with the following formula:
Control cost = Actual cost minus Scrap minus Work in process
History
Last changed by/on | SAP | 19990503 |
SAP Release Created in |