SAP ABAP Data Element WKGXXXP (Total Plan Costs)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element | WKGXXXP |
Short Description | Total Plan Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan costs |
Medium | 15 | Plan costs |
Long | 20 | Plan costs |
Heading | 21 | Plan costs |
Documentation
Definition
Costs that were planned for an object such as a material, cost center, business process, order (such as a production order, process order, or cost object ID.
Use
In Overhead Cost Controlling, this field shows the planned costs.
In Product Cost Controlling, this field shows the following planned costs, depending on the target cost version:
- The planned costs for the material
Such costs are also called standard costs in the SAP system. These costs are calculated in make-to-stock production with a standard cost estimate for the material that is not based on an order.
- In sales-order-related production with a valuated sales order stock, these costs can for example be calculated on the basis of a sales order cost estimate or according to the standard price of the collective requirements material. (See also Without Valuation Strategy.)
- The planned costs calculated in an alternative material cost estimate, such as a modified standard cost estimate
- The planned costs calculated in a preliminary cost estimate for the production order or the process order
- The planned costs calculated in a preliminary cost estimate for the product cost collector
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in |