Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MEL (Package) Vendor Evaluation
Basic Data
Data Element | WEPRZ |
Short Description | Minimum Delivery Quantity (Percentage) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PRZ21 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 1 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Min.D.Qty% |
Medium | 15 | Min.Del.Qty % |
Long | 20 | Min. Del. Qty in % |
Heading | 7 | Min. % |
Documentation
Definition
Indicates the percentage of the order quantity that counts as the minimum quantity to be delivered.
Use
Here you enter the minimum percentage of the PO quantity that must be delivered in order for the goods receipt to be included in the vendor evaluation.
In this way, you can prevent a vendor from receiving a good score for a punctual delivery, where the quantity delivered was insufficient.
Dependencies
This value is applied if you have not set the indicator Minimum delivery quantity/stand. delivery time variance from material - i.e. if no value from the material master record (purchasing value key) is to be used or if the relevant field in the material master record has not been maintained.
Supplementary Documentation - WEPRZ 0001
Use
Here you enter the minimum percentage of the PO quantity that must be delivered in order for the goods receipt to be taken into account in the evaluation of the vendor.
Examples
Dependencies
This value is applied if you have not set the indicator Minimum delivery quantity/standardizing value for delivery time variance from material (that is, if no value from the material master record is to be used), or if the relevant field in the material master record has not been maintained.
The system only applies the parameter in computing scores if the delivery date was adhered to exactly.
History
Last changed by/on | SAP | 19980218 |
SAP Release Created in |