SAP ABAP Data Element UBC_DT_CEPROC (Indicator: Cost Events Successfully Processed)
Hierarchy
☛
FINBASIS (Software Component) Fin. Basis
⤷ FIN-FB (Application Component) Financials Basis
⤷ UBC_BASIS (Package) FSCM Biller Consolidator - Basis Functions
⤷ FIN-FB (Application Component) Financials Basis
⤷ UBC_BASIS (Package) FSCM Biller Consolidator - Basis Functions
Basic Data
Data Element | UBC_DT_CEPROC |
Short Description | Indicator: Cost Events Successfully Processed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 11 | Processed |
Long | 11 | Processed |
Heading | 11 | Processed |
Documentation
Definition
Indicator to show that the cost events have been processed by a customer or partner implementation of the Business Add-In (UBC_CE_TRANSFER).
Use
If you set this indicator in your implementation of the Business Add-In (UBC_CE_TRANSFER), the calling program (report: RFUBCCECRE) knows that the cost events have been processed.
Do not use the indicator to let the calling program know that individual cost events could not be processed. You should only use the table parameter "Return" for this.
Dependencies
If the indicator is not set, the calling program assumes that the cost events were not processed. The status of the cost events is not set to "processed". No further cost event transfer is possible.
Example
History
Last changed by/on | SAP | 20041006 |
SAP Release Created in | 200 |