SAP ABAP Data Element TOLUN (Planning file entry: underdelivery tolerance)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element TOLUN
Short Description Planning file entry: underdelivery tolerance  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PROZENT100    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Underdel. 
Medium 15 Underdelivery 
Long 23 Underdeliv. tolerance 
Heading 10 Underdel. 
Documentation

Definition

If an undelivery is made for a material in a goods movement and the final delivery indicator has been set, you use this indicator to determine when the system is to create an entry in the planning file for MRP.

Here, you can enter the tolerated difference (as a percentage) from the original quantity of the procurement element (purchase order, production order, reservation). If this tolerance is exceeded then a planning file entry is created.

In the standard system, the value "zero" is preset, that is, an entry is always made if an overdelivery exists. No entry is made if the exact required quantity is delivered. If, in this case, you also want the system to create an entry in the planning file, you must enter the value "100" that usually has the same effect as "zero".

Definition

History
Last changed by/on SAP  19960103 
SAP Release Created in