Hierarchy
⤷ FI-SL-IS (Application Component) Information System
⤷ GRWT (Package) Report Painter / Report Writer
Basic Data
Data Element | STATE_D |
Short Description | Indicator: Row/column inactive? |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Inactive |
Medium | 15 | Inactive |
Long | 20 | Inactive |
Heading | 1 | I |
Documentation
Definition
If a report consists of several rows or columns, you can deactivate (suppress) individual rows or columns in the report. This can be very useful for reports in test status.
Possible entries:
- 'X' = row/column is suppressed
- ' ' = row/column is not suppressed
Supplementary Documentation - STATENDDTA0001
Use
The analysis period is needed to be able to find whether the total of the entered intensive care beds equals the number of set up intensive care beds - as results from the table TN10B for the institution (statistical bed capacity figures).
Since the bed capacity figures are maintained time-dependently, the specification of the analysis period is necessary.
Procedure
Examples
Dependencies
Supplementary Documentation - STATENDDTA0002
Use
End of the period in which the system searches for assignments of patients to the organizational unit specified.
Procedure
Examples
Dependencies
Supplementary Documentation - STATENDDTA0003
Use
The evaluation period determines which material requisitions are evaluated by the program. A material requisition is evaluated if the date on which it was created is after or identical to the start of the evaluation period and is before or identical to the end of the evaluation period.
Procedure
Examples
Dependencies
Supplementary Documentation - STATENDDTA0004
Use
Country version Switzerland (CH):
You can only specify 12/31 of the year as the end date for evaluation.
Please note that the end and start dates must be in the same year.
Dependencies
Example
History
Last changed by/on | SAP | 20010607 |
SAP Release Created in |