SAP ABAP Data Element STAT_ACDUR (Actual work)
Hierarchy
☛
SAP_BASIS (Software Component) SAP Basis Component
⤷ BC-CUS-TOL-IMG (Application Component) Implementation Guide
⤷ SCSC (Package) R/3 Customizing Tools
⤷ BC-CUS-TOL-IMG (Application Component) Implementation Guide
⤷ SCSC (Package) R/3 Customizing Tools
Basic Data
Data Element | STAT_ACDUR |
Short Description | Actual work |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | STAT_DUR | |
Data Type | INT2 | 2-byte integer, only for length field before LCHR or LRAW |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 5 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 5 | ActWk |
Medium | 15 | Actual work |
Long | 20 | Actual work |
Heading | 55 | Actual work |
Documentation
Definition
Number of days spent on the activity.
Use
If the actual expenditure and the processing status are maintained, the remaining expenditure is calculated.
If the actual and remaining expenditure are maintained, the processing status is calculated.
Procedure
Examples
Dependencies
If the actual expenditure is reset, the remaining expenditure is calculated from the planned expenditure.
History
Last changed by/on | SAP | 19950421 |
SAP Release Created in |