SAP ABAP Data Element SHP_VL10_SHOW_SCHEDULE_LINE (Allow constraints on schedule line level)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       VL (Package) WS-SHP: General Processing for Shipping
Basic Data
Data Element SHP_VL10_SHOW_SCHEDULE_LINE
Short Description Allow constraints on schedule line level  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type SHP_VL10_SHOW_SCHEDULE_LINE    
Data Type CHAR   Character String 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 LimitSchLi 
Medium 15 LimitSchedLine 
Long 20 Limit schedule line 
Heading  
Documentation

Definition

You can use this indicator to limit selection of schedule lines due for delivery when

  • Delivery due date and/or
  • Planned goods issue date and/or
  • Route schedule

does not fall within selection range.

Background:

When processing the delivery list, there may be selection criteria at the schedule line level of the documents due for delivery (goods issue date, route schedule or wave pick, for instance).

In document-oriented processing (list type = index list in list profile with a delivery creation profile that contains the setting "Deliver selected items = space", similar to delivery list processing up to Release 4.5B, VL04), if one item contains a schedule line that is to be delivered that matches the selection criteria at item and schedule line level, the entire document is delivered.

In item- or schedule line-oriented processing, you can prevent display of schedule lines that do not meet schedule line criteria. Specifically, these schedule lines are then not included when the system calculates the proposal of the quantity to be delivered (see Rules for calculation of the delivery quantity proposal).

Along those lines, please note that quantity calculation using the preceding document, for example, deals with the oldest schedule line, even if it was not selected.

We recommend allowing limiting at schedule line level only under certain circumstances and then only if you have a good reason for doing so. A better option would be to use an ALV selection filter as you process the delivery list manually.

History
Last changed by/on SAP  19990421 
SAP Release Created in