SAP ABAP Data Element SHFLG (Safety time indicator (with or without safety time))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | SHFLG |
Short Description | Safety time indicator (with or without safety time) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SHFLG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SAFTY_T_ID | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SafetyTime |
Medium | 15 | Safety time ind |
Long | 20 | Safety time ind. |
Heading | 10 | SafetyTime |
Documentation
Definition
You use this indicator to switch on the safety time actual range of coverage for a material in MRP.
If you define a safety time, the requirements in MRP are brought forward on the time axis by the number of workdays you define here. The actual range of coverage corresponds to the number of days, by which the requirements are brought forward.
Using this indicator you can activate the safety time and you can set whether all requirements or only independent requirements (sales order, planned independent requirements, and so on) are to be brought forward.
The actual requirements dates are not changed.
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |