SAP ABAP Data Element SBDKZ (Dependent requirements ind. for individual and coll. reqmts)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MG (Package) Application development R/3 material master prior to 3.0
Basic Data
Data Element SBDKZ
Short Description Dependent requirements ind. for individual and coll. reqmts  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type SBDKZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name DEP_REQ_ID   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Ind./coll. 
Medium 15 Indiv./coll. 
Long 20 Individual/coll. 
Heading I/C 
Documentation

Definition

Indicator determining whether the following requirements are allowed for the dependent requirements of the material:

  • Individual requirements

    Requirement quantities of the dependent material are stated individually.

  • Collective requirements

    Requirement quantities of the dependent material are grouped together.

Use

You can maintain this indicator in the following places:

  • In the material master record
  • For the explosion type of the BOM item (in Customizing for Basic Data in Define Explosion Types)

The setting for the explosion type overrides that in the material master record.

Dependencies

If the material is assigned to a material type that does not allow quantity-based inventory management in this plant, you can set the indicator to individual requirements only.

If the stock is to be managed in sales order stock or project stock, the indicator must be set to one of the following options:

  • Individual and collective requirements
  • Individual requirements only

If a material managed in project stock is to be procured from another plant using a cross-company-code stock transport order, the indicator must be set to 2 (collective requirements) in the issuing plant because, in this specific context, individual project stock management is not possible in both plants.

History
Last changed by/on SAP  19991108 
SAP Release Created in