Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
Basic Data
Data Element | SBDKZ |
Short Description | Dependent requirements ind. for individual and coll. reqmts |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SBDKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DEP_REQ_ID | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ind./coll. |
Medium | 15 | Indiv./coll. |
Long | 20 | Individual/coll. |
Heading | 3 | I/C |
Documentation
Definition
Indicator determining whether the following requirements are allowed for the dependent requirements of the material:
- Individual requirements
Requirement quantities of the dependent material are stated individually.
- Collective requirements
Requirement quantities of the dependent material are grouped together.
Use
You can maintain this indicator in the following places:
- In the material master record
- For the explosion type of the BOM item (in Customizing for Basic Data in Define Explosion Types)
The setting for the explosion type overrides that in the material master record.
Dependencies
If the material is assigned to a material type that does not allow quantity-based inventory management in this plant, you can set the indicator to individual requirements only.
If the stock is to be managed in sales order stock or project stock, the indicator must be set to one of the following options:
- Individual and collective requirements
- Individual requirements only
If a material managed in project stock is to be procured from another plant using a cross-company-code stock transport order, the indicator must be set to 2 (collective requirements) in the issuing plant because, in this specific context, individual project stock management is not possible in both plants.
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |