SAP ABAP Data Element SA_AUFNR (Run schedule header number)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-TS (Application Component) Technical Application Support
     BK (Package) CO Cross-application Objects
Basic Data
Data Element SA_AUFNR
Short Description Run schedule header number  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type SA_AUFNR    
Data Type CHAR   Character String 
Length 12    
Decimal Places 0    
Output Length 12    
Value Table SAFK    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name RUNSCHD_HD   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 RS header 
Medium 15 RS header 
Long 20 Run schedule header 
Heading 12 RS header 
Documentation

Definition

Key that specifically identifies the run schedule header.

Supplementary Documentation - SA_AUFNR 0001

Use

Procedure

Enter the following data:

  • either the number of the RS header and, if necessary, a period of examination,
  • or the material number, version, selection key date and, if necessary, a period of examination.

Examples

Dependencies

Supplementary Documentation - SA_AUFNR 0002

Use

Here the RS header is recorded to which the planned order is assigned.

Procedure

Examples

Dependencies

Supplementary Documentation - SA_AUFNR 0003

Use

Procedure

In create mode, you can either choose a number yourself or have a concecutive number assigned for you by the system, depending on the method preferred by your company,

  • If you leave the field blank, the system will assign a number automatically.
  • If you enter a number, it must be within the corresponding number range.

Examples

Dependencies

Supplementary Documentation - SA_AUFNR 0004

Use

Several run schedule headers can exist for one material and production version. The run-times of the individual RS headers, however, may not overlap. Therefore, the selection key date together with the material number and the production version can be used as selection criteria to explicitly identify one particular run schedule header.

Procedure

If you do not know the number of a RS header, you can select the one you are interseted in by entering the material, the version, and the selection key date.

Supplementary Documentation - SA_AUFNR 0140

Dependencies

This field is only relevant, is the production order is assigned to a run schedule header via a planned order.

History
Last changed by/on SAP  19981210 
SAP Release Created in