SAP ABAP Data Element RUEZT (Setup and teardown time)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-TS (Application Component) Technical Application Support
     BM (Package) MM Cross-Application Objects
Basic Data
Data Element RUEZT
Short Description Setup and teardown time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC3_2    
Data Type DEC   Counter or amount field with comma and sign 
Length 5    
Decimal Places 2    
Output Length 6    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short SetupTime 
Medium 10 Setup time 
Long 20 Setup time 
Heading SetupT 
Documentation

Definition

Specifies the number of workdays needed to set up and tear down the various work centers where the material is processed. This value is the total of the setup and teardown times.

The setup and teardown time is independent of the order quantity.

Supplementary Documentation - RUEZT 0001

Use

Setup and teardown times are required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.

Procedure

You can define work scheduling times in the material master record in one of two ways:

  • Either you enter a lot size independent in-house production time.
  • Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size. If required, you can get the system to update this value from the routing.

History
Last changed by/on SAP  19981111 
SAP Release Created in