SAP ABAP Data Element RPLAN_STK (Statistical key figure plan parameters)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ FVVI (Package) R/3 appl.dev. for Financial Assets Management: Real estate
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ FVVI (Package) R/3 appl.dev. for Financial Assets Management: Real estate
Basic Data
Data Element | RPLAN_STK |
Short Description | Statistical key figure plan parameters |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RPLAN | |
Data Type | CHAR | Character String |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table | T820 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | GPL | |
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | StKFigPlP |
Medium | 15 | StatKyFigPlPara |
Long | 20 | StatKeyFig.plan.par. |
Heading | 15 | StKFigPlP |
Documentation
Definition
The planning parameters define various data, values and settings which are used for planning. The corresponding transactions are available in order to maintain these planning parameters.
The planning parameters are grouped in a general section as well as in an application-specific section for the General Ledger and Controlling. The following data is defined in the general section:
- By dividing up the planning parameter classes, specific planning parameters can only by used for certain applications (General Ledger, cost center accounting, orders).
- You determine the beginning and the end of the periods to be planned.
- You can define a period interval. If this is equal to 1, every period is planned between the from and to periods. If, for example, you only want to plan every 3rd period, you enter periods 3-12 with an interval of 3 instead of 1-12 with an interval of 1 in the planning parameter.
- In order to enable currency translation at rates specially defined for planning, you enter a rate category. This category determines the type of translation in the rate table and in used in planning. The rate standard SAP system. You are however also able to define your own rate categories and use them for planning.
- You can preallocate various settings in the planning parameters. An example of this, are the distribution keys which you can enter settings separately according to quantity and value field groups for. You can additionally specify whether only the values (e.g. for cost elements 400000, 420000), only the texts (e.g. for cost elements raw material consumption, direct labor costs) or both are displayed for the characteristics of a dimension (e.g. the cost centers 4711, 4712 or cost elements 400000, 420000).
The specific section of the General Ledger contains the following information:
- The set name specifies the dimension to be planned. You can enter basic, single or multidimensional sets. You create and edit the corresponding set via the set maintenance transactions.
- You can enter planning values as well as planned quantities for planning. The planning values can be managed in transaction, house and/or group currency depending on the ledger. If such a value field group is planned manually, the other field groups which are not to be planned manually will be automatically determined. Additional quantity fields can be managed in addition to quantity fields. In the planning parameter, you also specify which of the field groups are displayed first in the overview or period-related screen.
The specific section for Controlling contains the following information divided up according to the planning area:
- When you carry out primary cost planning, you can plan costs as well as consumptions. The costs can be managed in various currencies. Here, you determine which of the cost field groups are planned manually.Those remaining are planned automatically. An exception to this is the transaction currency which you can only plan manually or cannot plan at all. The planning parameters additionally determine which field groups should be displayed first on the overview or period-related screen.
- For activity planning, you can manually plan the activity quantity, the capacity, the quantity produced, the total activity price in controlling area currency and the total activity price in object currency. As in primary cost planning, the other respective field groups are determined automatically when you manually plan the price field group.
- When you carry out activity input planning, it is only possible to plan the total consumption. You can display the activity prices which were determined in the sender for activity planning. The debits resulting from the activity input and activity prices can also be displayed in various currency field groups.
- When you carry out statistical key figure planning, you can plan the current value and the maximum quantity. You can similarly only display the field groups which you can manually plan with this parameter.
History
Last changed by/on | SAP | 19990827 |
SAP Release Created in |