SAP ABAP Data Element QKZTRM (Partial Confirmation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ QM-IM (Application Component) Quality Inspection
⤷ QLPP (Package) QM inspection points
⤷ QM-IM (Application Component) Quality Inspection
⤷ QLPP (Package) QM inspection points
Basic Data
Data Element | QKZTRM |
Short Description | Partial Confirmation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Part. con. |
Medium | 15 | Partial conf. |
Long | 20 | Partial confirmation |
Heading | 3 | PCO |
Documentation
Use
If this indicator is set, this means that a partial confirmation occurs for the PP operations (in the create transaction) or that it has already occured (change and display transactions).
Dependencies
When quantities are confirmed to PP, they are simultaneously valuated in terms of the target costs, if the following prerequisites are fulfilled:
- Activities are planned in the task list.
- In PP-Customizing, the indicator for the proposal of activities is set for the current order type in the order confirmation parameters.
- You have not called up the details for the order confirmation.
If you have called up the details, the activities recorded in the detailed data are copied.
History
Last changed by/on | SAP | 19990310 |
SAP Release Created in |