Hierarchy
⤷ QM-QC-IS (Application Component) Information System
⤷ QG01 (Package) QM quality inspection analysis
Basic Data
Data Element | QKZTLSICHT |
Short Description | Indicator: Partial Lot View for Production Lots |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Documentation
Use
You can use the Partial lot view for production lots to determine whether lots from an inspection during production (inspection lot origin '03') should be inserted as partial lots at a hierarchical level.
- If you set this indicator, the following hierarchy applies for printing purposes:
Lot -> partial lot (n) -> operation (n) -> inspection point (n) -> characteristic (n) - Otherwise the following structure applies (default):
Lot -> operation (n) -> inspection point (n) -> characteristic (n)
In the partial lot view, information is displayed for the partial lot, to which the inspection point is assigned.
Dependencies
Note that in this view the system prints the inspection point that was assigned to the partial lot for the last operation.
Additionally, the system only prints the inspection points that have been processed for all operations. It is therefore advisable only to print inspection lots using the partial lot view, if the usage decision for these lots has already been made.
This indicator does not affect the representation of inspection lots for which no inspection during production is planned, (those that do not have origin '03').
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |