Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QP (Package) QM inspection plan characteristics
Basic Data
Data Element | QDYNHEAD |
Short Description | Level at Which Dynamic Modification Parameters Are Defined |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QDYNHEAD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table | TQ39A |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DYN_MODIF_LEVEL | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | DefLevel |
Medium | 15 | Dyn. mod. level |
Long | 20 | Dynamic mod. level |
Heading | 4 | DLvl |
Documentation
Definition
Identifies the level at which the decision for inspection stages is made and the quality level maintained.
Use
If the field for the dynamic modification level in the task list header does not contain an entry, the inspection scope is not dynamically modified for an inspection with a task list.
For dynamic modification of the inspection scope to occur, you must define a dynamic modification level and assign a dynamic modification rule to the relevant objects.
You have the following options:
- Lot-based dynamic modification at the level of the material and inspection type
The decision concerning the next inspection stage is made dependent on the inspection lot valuation. The dynamic modification rule is defined in the inspection type for the material. An inspection plan is not required. However, if you inspect with a task list, you can maintain a quality level for each inspection type, even if the same task list is already used. - Lot-based dynamic modification at the level of the material and task list
The decision concerning the next inspection stage is made dependent on the inspection lot valuation.
The dynamic modification rule is defined in the task list header; the rule then applies to all inspection characteristics. - Characteristic-based dynamic modification at the level of the material and inspection plan characteristic
The decision concerning the next inspection stage is made dependent on the inspection characteristic valuation.
The dynamic modification rule is defined in the task list for the inspection characteristic. You have the following options for assigning a dynamic modification rule:
- You define dynamic modification rules in the inspection characteristics for the task list.
- You define numbers of controlling characteristics in the inspection characteristics for the task list to which you have assigned a dynamic modification.
- You enter a dynamic modification rule in the task list header. This appears as a default value when you add inspection characteristics in the task list.
Dependencies
Note the following dependencies:
- Lot-based dynamic modification
The valuation rule for lot-based dynamic modification is specified in Customizing in the settings at client level. The valuation rule in the standard system is as follows:
- If an inspection with a task list is specified for a material with recording of characteristic inspection results, a worst-case principle applies. The dynamic modification valuation is "accepted" as long as no inspection characteristic was rejected.
- If an inspection with a task list is specified for a material without the recording of characteristic inspection results, lot-based dynamic modification is performed based on the usage decision.
- Characteristic-based dynamic modification
Dynamic modification at the characteristic level is only possible if the inspection setup for the material supports the recording of characteristic results.
If the task list calls for dynamic modification at the characteristic level and the material is not set for the recording of characteristic results, no dynamic modification is carried out. The quality level is not updated.
History
Last changed by/on | SAP | 19980428 |
SAP Release Created in |