SAP ABAP Data Element PS_MDAYS (Minimum runtime in days for project interest calculation)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-COS-PER-IC (Application Component) Interest
     KAPI (Package) Interest calc./mass processing
Basic Data
Data Element PS_MDAYS
Short Description Minimum runtime in days for project interest calculation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUM3    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Min.durn 
Medium  
Long 20 Minimum runtime 
Heading 10 Min.durn 
Documentation

Definition

Minimum runtime in days, from which interest is charged for projects with this interest indicator.

When this period has elapsed or has been exceeded, interest is charged retrospectively.

History
Last changed by/on SAP  19950401 
SAP Release Created in