SAP ABAP Data Element PS_FLGWBS (Indicator: Network scheduling)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
Basic Data
Data Element | PS_FLGWBS |
Short Description | Indicator: Network scheduling |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Netw schd. |
Medium | 16 | Netw. scheduling |
Long | 20 | Network scheduling |
Heading | 5 | N Sch |
Documentation
Definition
- WBS determines dates
In the case of forwards scheduling the earliest start date of the activities (or in the case of backwards scheduling the latest finish date) is determined by the basic dates of the WBS elements to which the activities are assigned.
- Network determines dates
In the case of forwards scheduling the earliest start date of the activities (or for backwards scheduling the latest finish date) is determined by the basic dates of the network header.
History
Last changed by/on | SAP | 20010427 |
SAP Release Created in |