Hierarchy
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BK (Package) CO Cross-application Objects
Basic Data
Data Element | PS_AKSTL |
Short Description | Requesting cost center |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KOSTL | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table | CSKS |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | KOS | |
Default Component name | REQUEST_CCTR | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Request.CC |
Medium | 15 | Req.cost center |
Long | 20 | Request. cost center |
Heading | 10 | Req. CC |
Documentation
Definition
Key for the cost center that requested the investment measure.
Supplementary Documentation - PS_AKSTL 0000
Organizationally the WBS element is assigned to the responsible cost center; this can be the requesting cost center.
Example
The cost center "Printing" needs a new machien for folding newspapers. The cost center "Building Supervision" ist responsible for the execution of the measures.
A WBS element is created with "Printing" as the requesting cost center and "Building Supervision" as the responsible cost center.
Use
The requesting cost center is important in Investment Management:
If the WBS is a capital investment measure, the system transfers the requesting cost center into the master record of the corresponding asset under construction.
Supplementary Documentation - PS_AKSTL 0001
Definition
The key of the cost center that requests the work from the order in question.
The order is assigned to the responsible cost center, which can be the requesting cost center.
Use
Procedure
The responsible cost center is significant for investment management. If the WBS element is a capital investment measure the system copies the requesting cost center into the master record of the asset under construction.
Examples
The cost center "printing" requires a new machine to fold newspapers. The cost center "Building Supervision" is responsible for conducting the building work. An order is created in which "printing" is entered as the requesting cost center. "Building Supervision" is the responsible cost center.
Dependencies
Supplementary Documentation - PS_AKSTL 0210
Dependencies
If you do not maintain a controlling area for the cost center in question, the system will use the controlling area from the project definition as a default value.
History
Last changed by/on | SAP | 19990629 |
SAP Release Created in |