SAP ABAP Data Element PRUEFPKT (Independent validation)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-DM-MR (Application Component) Meter Reading
⤷ EE16 (Package) IS-U: Meter Reading Order Creation
⤷ IS-U-DM-MR (Application Component) Meter Reading
⤷ EE16 (Package) IS-U: Meter Reading Order Creation
Basic Data
Data Element | PRUEFPKT |
Short Description | Independent validation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PRUEFPKT | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | TE218 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DEPENDENTVALIDATION | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ind. val. |
Medium | 15 | Indep. valid. |
Long | 20 | Indep. validation |
Heading | 3 | IV |
Documentation
Definition
The following types of independent validations exist:
- Fixed validations carried out automatically by the system.
- 95 (previous meter reading implausible)
- If the meter reading result from the previous meter reading is implausible, the current meter reading result is deferred. You cannot release it until the previous meter reading has been processed.
- 96 (fixed value deviation validation)
- The system checks whether consumption is impermissible in the following cases:
- - The installation is inactive, that is, no one lives in the premise
- - The installation/device is disconnected
- - The meter reading from the previous removal or certification reading
is exceeded when the device is installed - 97 (resetting register validation)
- The system checks whether the number of times the register was reset corresponds to the number of meter readings.
- Variable validations that you select and allocate to registers.
- 01 (zero consumption)
- The system checks whether the current consumption of a register is zero and whether this is permissible.
- 02 - 04 (permitted number of meter readings by the customer,
estimations and estimations + meter readings by
the customer) - The system checks whether the permitted number of readings of a certain type is exceeded as defined in meter reading control
- 05-07 (tolerance limts, absoulte, relative and floating)
- The system checks whether the current consumption falls below or exceeds absolute, relative or floating tolerance limits
- Current consumption is compared with the consumption from X number of previous periods. The base period is the starting period for the comparison. Previous base periods are also used for comparison.
- 11 (usage hours greater than usage hours of previous period)
- For more information, see usage hours.
- 12 (usage hours compared to fixed value)
- 13 (current demand compared to maximum demand)
- 14 (current demand compared with minimum demand)
- 15 (meter overflow)
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |