SAP ABAP Data Element PPE_ANAL_PRIO (Take Evaluation Priority of Variants into Consideration)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEENG0C (Package) Customizing the iPPE-Engine
Basic Data
Data Element PPE_ANAL_PRIO
Short Description Take Evaluation Priority of Variants into Consideration  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Eval.Prio. 
Medium 16 Var. Eval. Prio. 
Long 31 Eval. Priority of Variants 
Heading 47 Take Eval. Priority of Vars into Consideration 
Documentation

Definition

Activates the priority evaluation function. The selection of component variants, as well as the object dependency, can be regulated by the priority evaluation function when the product structure is exploded.

Use

Set this indicator if the object dependency at the component variants of a node can be maintained in such a way that several component variants can be effective at explosion. The component variant with the highest value in the priority evaluation field is then effective.

Dependencies

The priority indicator is displayed on the tab page of a structure node when the indicator is set. The Prioritization field is displayed on the Variants tab page when the indicator is set at a node. The field is filled automatically when you save object dependencies for component variant. The value is determined from the number of terms linked by and. You can also change the value manually.

CAUTION: When you use the priority evaluation function, the material that the system selects as the effective material is ignored by the characteristics planning.

History
Last changed by/on SAP  20041209 
SAP Release Created in