SAP ABAP Data Element PLINT_T (Indicator 'Integrated Planning' for Cost Object Category)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | PLINT_T |
Short Description | Indicator 'Integrated Planning' for Cost Object Category |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Int.Plan. |
Medium | 15 | Integ. Planning |
Long | 20 | Integrated Planning |
Heading | 3 | IPl |
Documentation
Definition
This indicator determines, if a cost object plays a role in integrated planning or not. This is defined according to cost object categories in customizing.
The costs associated with an integrated planning cost object/ activity inputs are updated if 'integrated planning' is activated in the version: maintain plan versions .
The planning data is then passed on to the profit center and the general ledger.
History
Last changed by/on | SAP | 19990223 |
SAP Release Created in |