Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KBAS (Package) Overhead Cost Controlling
Basic Data
Data Element | PKZKS |
Short Description | Lock Indicator for Plan Secondary Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | YNFLG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan sec. |
Medium | 15 | Plan secondary |
Long | 20 | Plan secondary costs |
Heading | 6 | PlnSec |
Documentation
Definition
Defines whether a cost center is locked for planning with secondary costs.
Use
If you select this indicator, you cannot plan any secondary costs on the affected cost center from this time.
The indicator normally locks the cost center only against debits with secondary costs in the plan. However, you can still credit the cost center in the plan.
Procedure
To change the behavior of this indicator such that sender cost centers are also excluded from allocation, you can change the category of message GM 155 from I (information) to E (error).
To change the message type, access the IMG and choose Controlling -> General Controlling -> Change Message Control. Enter GM as the application area. You can then make a new entry for the message number 155, which entry deviates from the standard message type.
Message control
Supplementary Documentation - PKZKS 0001
Note
Field changes
The data in this field can be changed daily.
Time dependency
You can define this field as time-based in the configuration menu of Cost Center Accounting.
- If you activate this indicator, you can maintain separate data for any number of different time intervals.
- If you do not activate this indicator, you can make only one field entry valid for all intervals. If, however, you change a time-based field, you can enter a new value in the non-time-based field that is valid for the interval of the time-based field.
Supplementary Documentation - PKZKS 0002
Note
This is only a default value. It is called up by the system when you select the cost center category for a cost center during master data maintenance. You can change this default value to meet your requirements under the "Control" tab.
History
Last changed by/on | SAP | 19981111 |
SAP Release Created in |