SAP ABAP Data Element PHIN_D_PO_NOT (Activity: Set Status of Notifications to Completed)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ PM-EQM-THO (Application Component) Takeover/Handover of Technical Objects
⤷ PHIN (Package) Takeover/Handover of Technical Objects
⤷ PM-EQM-THO (Application Component) Takeover/Handover of Technical Objects
⤷ PHIN (Package) Takeover/Handover of Technical Objects
Basic Data
Data Element | PHIN_D_PO_NOT |
Short Description | Activity: Set Status of Notifications to Completed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ntf. Comp. |
Medium | 20 | Notif. Stat.Complete |
Long | 40 | Set Notification Status to Completed |
Heading | 50 | Activity: Set Notification Status to Completed |
Documentation
Definition
Use
If this flag is switched on, the notifications for the technical objects get the status Completed (NOCO) in the background during handover.
When you complete a notification, the following occurs:
- The reference time is determined. The system bases it on the data in the maintenance notification, but you can overwrite it.
- The reference time is the date and time at which the maintenance notification is listed in the history with the location and account assignment data valid specifically for the reference object.
- The system enters the maintenance notification in the history with the exact location and account assignment data that was valid for the reference object at the reference time.
- The maintenance notification is now blocked for changes, in other words, you can no longer change the notification data.
For more information, see SAP Library under SAP ERP Central Component -> Logistics -> Plant Maintenance -> Maintenance Order Management (PM-WOC) -> Notifications (CS-CM-SN/PM-WOC-MN) -> Notification Completion.
Dependencies
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |