SAP ABAP Data Element PGCLOSED (Indicator: Pegging completed)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PS-MAT (Application Component) Material
     GRPG (Package) Grouping/Pegging for Individual Project Planning
Basic Data
Data Element PGCLOSED
Short Description Indicator: Pegging completed  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Completed 
Medium 15 Completed 
Long 20 Completed 
Heading 10 Completed 
Documentation

Definition

This indicator specifies that pegging and the consequent processes have been completed entirely.

The indicator is set, if no postings are to be expected to a procurement element for grouped requirements (for instance if the production order has been completed) and all costs and revenues have been completly distributed.

If the assigned quantity is changed subsequently for a pegging process, the indicator is reset. The asignment is taken into account for the next distribution run.

History
Last changed by/on SAP  19980525 
SAP Release Created in