SAP ABAP Data Element PERKZ (Period indicator)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
Basic Data
Data Element | PERKZ |
Short Description | Period indicator |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PERKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | PKZ | |
Default Component name | PERIOD_IND | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Period ind |
Medium | 15 | Period ind. |
Long | 20 | Period indicator |
Heading | 2 | PI |
Documentation
Definition
Indicator specifying the periods in which the material's consumption values and forecast values are managed.
Supplementary Documentation - PERKZ 0001
Use
You use the period indicator to specify the period for the evaluation of the stock and receipt statistics on the Period Statistics tab page. The system then determines the receipt and requirement quantities in the current period, next period, and the period after next, as well as the quantities that are already subject to delay.
Procedure
When you call the period statistics for the first time, the system uses the default period you specified in the evaluation profile for range-of-coverage data. However, you can also change the period manually:
- For example, you can specify 'month'. The system then determines the receipt and requirement quantities for the next two months.
- If you want the system to use planning calendars to determine the period, enter the required calendar in the neighboring Planning Calendar field.
- If you want the system to evaluate the period using the fiscal period, define a fiscal year variant in the MRP material master.
Examples
Dependencies
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |