Hierarchy
⤷ PY-AU-PS (Application Component) Public Sector
⤷ P13P1 (Package) HR-AU-PS: Master data for Public sector Australia
Basic Data
Data Element | PAU_HDAPT |
Short Description | End date for evaluating HDA performing period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SYDATS | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Date |
Medium | 15 | Current Date |
Long | 20 | Current Date |
Heading | 10 | Date |
Documentation
Definition
If this period is specified, only those HDA performing falling within this period will be evaluated. It is also possible to input only begin or end date here. That means only from the date onwards or till the date, the HDA performing is valid for this execution.
Procedure
The following reporting options are available:
- For the entire period
If you do not make an entry, the program will skip this parameter.
- For partial periods
If you only enter the upper limit in the right column, that means to calculate HDA performing till this date. If you only enter the lower limit in the left column, that means to calculate HDA performing from this date.
Example
You want to evaluate HDA performing time for financial 2002 (eg: 01.09.2001-31.08.2002). Enter 01092001 as the start date and 31082002 as the end date in the data selection period field.
History
Last changed by/on | SAP | 20020506 |
SAP Release Created in | 470 |