SAP ABAP Data Element P01C_CHKRD (Check Relevant Data Against Valuation End)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
Basic Data
Data Element | P01C_CHKRD |
Short Description | Check Relevant Data Against Valuation End |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Chk Rel.Dt |
Medium | 15 | Check Rel. Date |
Long | 20 | Check Relevant Date |
Heading | 3 | Chk |
Documentation
Definition
The relevant date is determined from the trigger date (usually leaving or pension date). If the end date of the last valuated entitlement record is before this trigger date, the trigger date can be replaced by the valuation end date for the entitlement using this indicator.
Example
Period end: Last day of month before trigger date
Period duration: 12 months
Trigger date: Leave date 17.02.1998
Entitlement: Start 01.01.1960, ended since 01.01.1997
(the last valuation-relevant day is 31.12.1996)
In this case, the indicator sets the trigger date to 01.01.1997 (day after 31.12.1996) and the twelve months starting at the last day of the month before this date are used (01.01.1996 to 31.12.1996).
History
Last changed by/on | SAP | 19990312 |
SAP Release Created in |