Hierarchy
⤷ PY-DE (Application Component) Germany
⤷ PC01 (Package) HR Payroll: Germany
Basic Data
Data Element | P01_EHVE_AUSWJ_VORQ |
Short Description | Period of Last Evaluation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | GJAHR | |
Data Type | NUMC | Character string with only digits |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Last Per. |
Medium | 15 | Last Period |
Long | 30 | Period of Last Evaluation |
Heading | 30 | Period of Last Evaluation |
Documentation
Definition
Period in which the last evaluation was started for the previous quarter.
Use
This field can normally be left blank.
The report takes into account all retroactive accounting that takes place on the preceding periods in the evaluation quarter.
This parameter allows retroactive accounting to be taken into account starting with a certain in-period of the evaluation quarter. Set the parameter to the highest in-period that was already processed in the evaluation for the previous quarter.
Example
The survey of earnings should be carried out for the second quarter 2007. In the survey of earnings for the first quarter 2007, retroactive accounting from 04/2007 was already taken into account, because the parameter Period of the current evaluation was set to 04/2007. This retroactive accounting must not be processed again in the evaluation for the second quarter 2007.
For this, set the parameter Period of the last evaluation to 04/2007. This has the effect that the retroactive accounting from the evaluation quarter on the preceding periods is taken into account starting with the in-period 05/2007.
History
Last changed by/on | SAP | 20071120 |
SAP Release Created in |