SAP ABAP Data Element MLST_ACTTM (Actual date/time (Milestone met))
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
Basic Data
Data Element | MLST_ACTTM |
Short Description | Actual date/time (Milestone met) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ATIME | |
Data Type | TIMS | Time field (hhmmss), stored as char(6) |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ACTUAL_TIME | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Time |
Medium | 15 | Time |
Long | 20 | Time |
Heading | 8 | Time |
Documentation
Definition
Time at which the percentage of completion was reached for the milestone.
Use
The time is used in determining the percentage of completion of the activity. The actual date for the milestone is either
- manually entered or
- copied from the confirmation of the activity, if the percentage of completion is less than or equal to the degree of processing in the confirmation.
Dependencies
If you have not entered a percentage of completion in the milestone, you cannot copy the time from the confirmation.