SAP ABAP Data Element MDV02 (Planning identification 2)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP-REM (Application Component) Repetitive Manufacturing
     MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element MDV02
Short Description Planning identification 2  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MDVXX    
Data Type CHAR   Character String 
Length 8    
Decimal Places 0    
Output Length 8    
Value Table T437P    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name PLANING-ID   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plng ID 2 
Medium 15 Planning ID 2 
Long 20 Planning ID 2 
Heading PlngID 2 
Documentation

Definition

Enables you to group various materials either by location or by time for planning and evaluation purposes. For example, you can assign a planning ID to all materials that are manufactured on a certain production line.

The planning ID is assigned to a production version. If you create a material with a certain production version, the planning ID of this version is transferred automatically.

Use

When accessing the planning table by production line, you can limit your selection further by entering a planning ID. This makes sense if, for example, you manufacture a lot of different materials on one production line, but do not process all materials at the same time. You could then use a planning ID to group, for example, all materials manufactured in a specific packaging size. Then you can group the materials together by creating a planning ID per group and entering this planning ID in the production versions.

Planning IDs also allow simpler planning of quantities on production lines, since you can use the planning table to display totals for planning IDs. To do this, you must have created the production line as a planning ID (description of production line = description of planning ID).

Dependencies

If you want to use the planning ID instead of the production version in planning, you must create a work center and enter this work center in the production version in the production line field.

Supplementary Documentation - MDV02 0001

Use

Procedure

Enter one or two planning identifications and, if necessary, a period of examination.

Examples

Dependencies

Supplementary Documentation - MDV02 0002

Use

Procedure

If you enter a planning ID here, the system selects all the planned orders of materials that are assigned to this planning ID.

Examples

Dependencies

History
Last changed by/on SAP  19981109 
SAP Release Created in