SAP ABAP Data Element MD_PLIFZ_DB (Consider Planned Delivery Time of the MRP Area)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ MD06 (Package) Development Material Requirements Planning
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ MD06 (Package) Development Material Requirements Planning
Basic Data
Data Element | MD_PLIFZ_DB |
Short Description | Consider Planned Delivery Time of the MRP Area |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MD_PLIFZ_DB | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cnsd PlDTi |
Medium | 18 | Consider PlDelTime |
Long | 30 | Consider Planned Delivery Time |
Heading | 0 |
Documentation
Definition
Indicator that determines whether the planned delivery time is used in the MRP area.
Use
Procedure
You have maintained a planned delivery time in the MRP area. If the planned delivery time for the MRP area is to be used for the external procurement of material for the MRP area, you must set the value "Use Planned Delivery Time MRP Area". Otherwise, the planned delivery time of the plant will be used.
Examples
Dependencies
For stock transport requisitions (plant to a storage location MRP area of the same plant) the planned delivery time of the MRP area is only used if the indicator "Consider Planned Delivery Time" is set.
History
Last changed by/on | SAP | 20011120 |
SAP Release Created in | 470 |