Hierarchy
⤷ PP-IS (Application Component) Information System
⤷ MCF (Package) R/3 application development: Shop Floor Information System
Basic Data
Data Element | MC_PLCHK2P |
Short Description | Plausibility Check: Actual Finish Date before Start Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Act.Finish |
Medium | 15 | Actual Finish |
Long | 20 | A.Finish Bef.A Start |
Heading | 4 | Fin. |
Documentation
Definition
Indicator that checks whether the actual end date has been set before the actual start date in the production order.
Dependencies
The actual start date is set when the production order is confirmed for the first time. The actual finish date is set by the goods receipt for the production order.
Example
The goods receipt is posted to a production order, yet the first completion confirmation does not occur until days later. In this case the production order has an actual finish date, which is before the actual start date. This leads to problems in the Shop Floor Information System with the calculation of actual lead time and actual queue time.
In the update definition, you can formulate the following condition to check the plausibility indicator:
MCAFPO-PLCHK2P NE TRUE
If this condition is used, the system updates only production orders whose actual finish date was reported after the actual start date.
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in |