SAP ABAP Data Element MC11V_0SSL_VSMNG (Delivered Quantity in Sales Unit of Sales Order Sched. Lines)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   LO-LIS (Application Component) Logistics Information System (LIS)
     MCEX (Package) Extraction Interface LIS-BW
Basic Data
Data Element MC11V_0SSL_VSMNG
Short Description Delivered Quantity in Sales Unit of Sales Order Sched. Lines  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG13    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 13    
Decimal Places 3    
Output Length 17    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Deliv.qty 
Medium 15 Delivery Qty 
Long 20 Delivered Quantity 
Heading 20 Delivered quantity 
Documentation

Definition

The portion of the delivery quantity of a delivery item that is assigned to a confirmed schedule line in the extraction structure MC11V_0SSL.

Use

This field is used to assign the delivered quantities for an order item to the confirmed quantities of the schedule lines for the order item. This assignment is basically dynamic, and is redetermined whenever an extraction operation takes place. There is no fixed assignment between order schedule lines and delivery items.

The shipped quantity is shown in the sales unit of the order schedule line.

Conversion factors are available in the base unit of quantity from the order schedule line and in the extraction structure for individual conversions.

A schedule line with delivery block is then only assigned to a quantity if it is the last schedule line for an item and if the total quantity of the existing delivery items could not yet be assigned.

Example

A sales order item contains the following 4 schedule lines:

Schedule line    Delivery date        Required quantity    Confirmed quantity.

1    01.06.2002        150    0

2    05.06.2002        0    50

3    10.06.2002        0    50

4    15.06.2002        0    50

The item is filled with the following two delivery items:

Delivery    Item     Creation date        Delivery quantity

8001    10    06.06.2002        20

8002    10    12.06.2002        60

In the extraction structure MC11V_0SSL this gives rise to the following assignment of deliverd quantities:

Schedule line.    Delivery     Item    Required quantity     Confirmed quantity    Shipped quantity

1            150    0    0

2    8001    10    0    50    20

2    8002    10    0    0    30

3    8002    10    0    50    30

4            0    50    0

If the delivery 8001 is now deleted, this gives rise to the following assignment of delivered quantities for the new data records if the extraction structure.

Schedule line    Delivery     Item    Required Qunatity     Confirmed quantity    Shipped quantity

1            150    0    0

2    8002    10    0    50    50

3    8002    10    0    50    10

4            0    50    0

History
Last changed by/on SAP  20030325 
SAP Release Created in