SAP ABAP Data Element MBDAT (Material Staging/Availability Date)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ VL (Package) WS-SHP: General Processing for Shipping
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ VL (Package) WS-SHP: General Processing for Shipping
Basic Data
Data Element | MBDAT |
Short Description | Material Staging/Availability Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | MS_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Mat.Av.Dt. |
Medium | 15 | Mat.Avail.Date |
Long | 20 | Material Avail. Date |
Heading | 10 | Mat.Av.Dt. |
Documentation
Definition
The date by which sufficient quantities of the item must be available for picking to begin.
Use
The system uses the material availability date to generate automatic production and purchasing requirements. The system calculates the material availability date by working backwards from the customer's requested delivery date, taking into account how much time is needed for delivery-related procedures, such as picking, packing, loading, and transportation.
Procedure
The system proposes the material availability date. You can change the date manually in the sales document.
Dependencies
The picking date is the same as the material availability date.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |