SAP ABAP Data Element LTAK_SOLEX (Planned Transfer Order Processing Time from External System)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ LVS (Package) Application development Warehouse Management (WM)
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ LVS (Package) Application development Warehouse Management (WM)
Basic Data
Data Element | LTAK_SOLEX |
Short Description | Planned Transfer Order Processing Time from External System |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PW_QUAN13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 18 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan Ext. |
Medium | 16 | Plan Time Ext. |
Long | 23 | Plan Time External Sys. |
Heading | 19 | Plan Time Ext. Sys. |
Documentation
Definition
The total planned transfer order processing time includes the planned processing time in WM plus the planned processing time that was transmitted from an external system to WM:
TIME(TOTAL) = TIME(WM) + TIME(EXTERNAL)
Use
The external planned processing time can be used, for example, when an automated storage/retrieval (AS/RS) system is in service that can report the exact amount of travel time that is needed to carry out a physical stock movement. When determining the planned processing time, the calculation of the WM travel time could be suppressed. The system could be set up in this case so that the travel time from the external system would be used in the calculation of the total planned TO processing time.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |