SAP ABAP Data Element LINE_TERM (Takt time-/rate-based scheduling of planned order)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CX (Package) R/3 Application development: R/3 Scheduling
Basic Data
Data Element LINE_TERM
Short Description Takt time-/rate-based scheduling of planned order  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 TaktTmSchd 
Medium 18 TaktTm-/rateSched. 
Long 20 TaktTm-/rateSched. 
Heading 18 TaktTm-/rateSched. 
Documentation

Definition

Specifies that during the scheduling of planned orders scheduling based on takts from Sequencing determines the dates. In other words, lead time scheduling does not overwrite the planned order dates in the routing or rate routing, which were determined in scheduling based on takts. Lead time scheduling is only used to generate capacity requirements and the corresponding dates.

Dependencies

  • In scheduling based on takts capacity requirements are only generated for scheduling levels for which you have set the CapReqmnts indicator. The dates of the capacity requirements depend on whether you have also set the Scheduling indicator in the relevant scheduling levels:
    • If it is not set, then the capacity requirements are given the dates that were determined in scheduling based on takts, the planned order dates.
    • If it is set, the capacity requirements are given the dates, that were determined in lead time scheduling.
    • Note that the dates determined inscheduling based on takts and those determined in lead time scheduling can be different.
  • If you set the scheduling based on takts indicator, the basic dates of the planned order are not adjusted during lead timne scheduling and finite scheduling. The system automatically makes the corresponding settings in the Adjust scheduling section of the screen, when you choose Enter or save. You cannot change these settings as long as the indicator is set.