SAP ABAP Data Element KKR_BISPER (Summarization period (to period))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KKR (Package) CO Hierarchy Summarization
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KKR (Package) CO Hierarchy Summarization
Basic Data
Data Element | KKR_BISPER |
Short Description | Summarization period (to period) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | POPER | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | To Period |
Medium | 15 | To Period |
Long | 20 | To Period |
Heading | 3 | TP |
Documentation
Definition
The summarization dates determine which periods the system is to look in when selecting data for summarization.
Use
You can plan costs for orders and projects as follows:
- with reference to a period or
- with total values (without reference to a period)
Summarization can only select values saved with reference to a period in the system.
- The following occurs when you carry out a summarization run:
- Values on the summarization object for periods within the specified summarization dates are reset and recalculated.
- Values on the summarization object for periods outside the specified summarization dates are not deleted. This means that values that were calculated with a previous summarization run are not deleted during the reorganization of the relevant orders or project.
- If you carry out a deletion run, the summarization dates are ignored.
Procedure
Enter a period interval.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |