SAP ABAP Data Element JV_PROJUPE (JV Project unsuspense period)
Hierarchy
EA-FIN (Software Component) EA-FIN
   CA-JVA (Application Component) Joint Venture und Production Sharing Accounting
     GJVB (Package) Joint venture billing
Basic Data
Data Element JV_PROJUPE
Short Description JV Project unsuspense period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type POPER    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Unsusp.Per 
Medium 15 Unsusp.Period 
Long 20 Unsuspensed Period 
Heading 12 Unsusp. Per 
Documentation

Definition

This element is the project unsuspensed period. The period in which a project is removed from suspense is placed in the field. From this date on, any entries made to the project on the JV ledger will be processed normally through cutback.

History
Last changed by/on SAP  20020108 
SAP Release Created in