Hierarchy
⤷ IS-A-JIT (Application Component) Just-In-Time Processing
⤷ ISAUTO_JIT (Package) Just-In-Time Calls Automotive (SeqJC, SumJC) - Inbound
Basic Data
Data Element | JIT_SWIST |
Short Description | Switch Processing Status (Action SWCG) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sts switch |
Medium | 15 | Status switch |
Long | 38 | Switch internal processing statuses |
Heading | 38 | Switch internal processing statuses |
Documentation
Definition
Determines that after switching components groups with action SWCG, the internal processing status of both components groups is switched.
Use
Usually, after the components group switch. the components groups of the internal call obtain an internal processing status. You can transfer the components groups to production and then continue with production.
In practice however, it often occurs that a completion message is made at several points in production in order to document and follow progress. If you want to switch the components groups of an internal call with a call that is already in production, you can also switch the internal processing status of the components groups after the switch has taken place. In this way the components groups of the internal call enter production and you can complete them.
Dependencies
Before the status change the system transfers the new processing statuses as defined in the call control.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |