Hierarchy
⤷ IS-A-JIT (Application Component) Just-In-Time Processing
⤷ ISAUTO_JIT (Package) Just-In-Time Calls Automotive (SeqJC, SumJC) - Inbound
Basic Data
Data Element | JIT_LPREORG |
Short Description | Include new DS items in transaction data (MAT-REORG) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RADIO | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Include DS |
Medium | 20 | Include DS items |
Long | 40 | Include delivery sch. items in JIT calls |
Heading | 40 | Include delivery sch. items in JIT calls |
Documentation
Definition
Inclusion of new delivery schedule items in sequenced JIT call movement data (call components) to replace old, rejected delivery scheduling agreement items with the same customer, customer material, unloading point and usage indicator.
Use
The system determines all the scheduling agreements for which a reason for rejection was defined ('old JIT material'). The system then checks to see if a scheduling agreement with the same data but without a rejection reason exists ('new JIT material'). The system then displays a list of all materials for which undelivered JIT calls exist (references to 'old' JIT material).
These references to an old JIT material (with a rejection reason) are changed so that they refer to the new material. Depending on the amount of data involved, this might take some time. For this reason, please execute this function during a work break.
- Select this option, and choose Execute.
- A list of replaceable materials appears. Select the materials that you want to replace, and choose Execute.
Hinweis
Call camponents that have already been delivered are not changed. If the components group has already been delivered ( a delivery number exists), the reference to the old scheduling agreement is retained.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |