SAP ABAP Data Element JIT_LABGEN1 (Requirements Matching until End of JIT Calls)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-A-JIT (Application Component) Just-In-Time Processing
⤷ ISAUTO_JIT (Package) Just-In-Time Calls Automotive (SeqJC, SumJC) - Inbound
⤷ IS-A-JIT (Application Component) Just-In-Time Processing
⤷ ISAUTO_JIT (Package) Just-In-Time Calls Automotive (SeqJC, SumJC) - Inbound
Basic Data
Data Element | JIT_LABGEN1 |
Short Description | Requirements Matching until End of JIT Calls |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | End JIT |
Medium | 18 | Match to end JIT |
Long | 25 | Match until end JIT calls |
Heading | 40 | Match requirements until end JIT calls |
Documentation
Definition
Specifies that for each material the system defines the last day on which JIT calls are still in the system. The system then carries out the requirements match only unitl this date.
Use
If you also want to generate JIT delivery schedules in the requirements matching, you can use this indicator to prevent the system from generating JIT delivery schedules outside this time frame, for which you have already received JIT calls.
Dependencies
- The system carries out the requirements match for the current day, even if no JIT calls have been received on this day.
- The basis for the requirements match are the Planned date of delivery of the JIT call and the Loading date of the forecast/JIT delivery schedule line.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |