SAP ABAP Data Element J_3GABGLG (Retirement Date Counts for Performance-Based Equipment)
Hierarchy
ECC-DIMP (Software Component) DIMP
   IS-EC-CEM (Application Component) Construction Equipment Management
     J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element J_3GABGLG
Short Description Retirement Date Counts for Performance-Based Equipment  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type X    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 RT/PBE 
Medium 15 RetireDate/PBE 
Long 26 RetireDate/Perf.BsdEqui. 
Heading RT/PBE 
Documentation

Definition

Controls whether the retirement date fro PBE is counted (and therefore missing hours automatically generated and filled) when you execute the filler calendar for PBE function. The only prerequisite is that at least one unit of activity has been entered in a PBE oroperator's report in the period of time that the equipment item was on the site.

If no PBE report has been entered, then equipment activity is settled in accordance with the shipping document (in other words, as a time- based equipment), irrespectively of whether the PBE as TBE indicator is set or not.

The retirement date is the actual date when the equipment item is removed from the construction site. If several changes of activity type take place on the construction site after the equipment item has been sent there, then the last day of the change of activity type is NOT taken as retirement date for SD settlement. The equipemt item is settled normally.

Use

Only for internal settlement and even then only when the filler calendar for PBE is used, otherwise only the actual activity units are settled.

Actual activity units are only ever used in external settlement.

Note:

PBE reports are settled if they have been entered. This indicator does not exclude documents from the settlement run.

History
Last changed by/on SAP  20050301 
SAP Release Created in